Similar Projects
Grade, Drain, Bridge and Surface
Renovation, Infrastructure
Design
$38,500,000 est. value
Tahlequah, OK 74464

Grade, Drain, Bridge and Surface
Infrastructure
Design
$40,000,000 CJ est. value
Tahlequah, OK 74464

RFP Design - Site Development - Pre-Construction Design Phase
Infrastructure
Bidding
$50,000 CJ est. value
Tahlequah, OK 74464

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Slabjacking and Subsealing Services
Infrastructure
Results

Blackgum Landing Road
Term Contract
Results
Cookson, Roland, OK

New Hospital - Cherokee Nation
New Construction, Infrastructure
Construction
$400,000,000 CJ est. value
Tahlequah, OK 74464

Mud Valley Road Waterline Relocations
Infrastructure
Construction
$1,465,563 CJ est. value
Tahlequah, OK 74464

Resurface
Infrastructure
Design
$1,000,000 CJ est. value
Tahlequah, OK 74464

RFP Design - Consulting Services for Design and Furnishings
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Tahlequah, OK 74464

Resurface (Asphalt) - SH-51
Infrastructure
Results
OK

Lake Region Electric Cooperative - Phase 1
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Hulbert, OK 74441

Utilities - SH 100
Infrastructure
Design
$2,000,000 CJ est. value
Cookson, OK 74427

4th Street Parking Lot Sealcoat and Re-Stripe
Infrastructure
Post-Bid
$300,000 CJ est. value
Tahlequah, OK 74464

Last Updated 03/31/2023 04:03 PM
Project Title

Mission Park Trails

Physical Address View project details and contacts
City, State (County) Tahlequah, OK 74464   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $152,550 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Mission Park Trail The Project consists of furnishing labor and equipment for the installation of approximately 1 mile of recreation trail and parking area for Mission Park. The project is located on the Northwest corner of Mission Avenue and W. 1st street. ALTERNATE #1 1. City shall furnish concrete. 2. Concrete shall be reinforced with elevated %" rebar on 2' centers. 3. Concrete shall be saw cut every 8'. 4. Concrete shall have a light broom finish. ALTERNATE #2 1. City shall furnish Asphalt 2. 2" asphalt shall match the finished grade of the 8"x6" thickened edge. *Bidders shall visit site and acquaint themselves with site conditions before bidding. Bidders may make their own investigations to satisfy themselves with site conditions. Completion- 75 calendar days

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents