Similar Projects
Chiller Maintenance Services
Infrastructure
Design
Detroit, MI 48201

HVAC Repairs and Maintenance
Term Contract
Sub-Bidding
Detroit, MI 48202

Air Duct Cleaning - Livonia Civic Center Library
Term Contract
Sub-Bidding
Livonia, MI 48154

HVAC and Mechanical Products
Term Contract
Post-Bid

Transfer Switch, Electrical & Gas Line Upgrades
Post-Bid
Dearborn, MI

FPM Tierney House AC Replacement - 2020
Results
Detroit, MI

Installation of Air Conditioning at the Garden City Ice Rink
Results
Garden City, MI 48135

HVAC Upgrade
Post-Bid
Less than $1,000,000 est. value
Flat Rock, MI

CDBG Emergency Furnace Replacement
Results
Taylor, MI 48180

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Hvac Improvements Oakwood CSO Facility - 1
Renovation
Results
Detroit, MI

HVAC Maintenance and Repair Service
Alteration
Post-Bid
Highland Park, Livonia, Taylor, Wayne, MI 48180

2021 Courtroom Rooftop Unit
Results
Wayne, MI

Classroom Air Conditioning Units
Alteration
Post-Bid
Detroit, MI

Walter Reuther Psychiatric Hospital Replace Chillers & Controls
Results
Westland, MI

Last Updated 08/31/2022 09:40 AM
Project Title

New HVAC Roof Top Unit at the Copeland Center

Physical Address View project details and contacts
City, State (County) Wyandotte, MI 48192   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated cost $20,000 Remove and dispose of existing roof top unit and replace with new as per specifications. General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % Job Location 2306 4th Street, Wyandotte, MI Question Acceptance Deadline 09/14/2022 12:00 AM EDT Questions are submitted online Yes

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents