Similar Projects
Last Updated 06/08/2021 02:29 PM
Project Title

FF Highway Pump Station Retrofit

Physical Address View project details and contacts
City, State (County) Parkville, MO   (Platte County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally includes: Demolition of the existing vacuum primed pump station, connecting piping, timber retaining walls, and chain link fencing. Raising the existing concrete wetwell with a pre-cast concrete manhole section. Replacing a short section of the force main at the existing station. Furnishing and installing a new package submersible pump station, with baseplate, frame, hatch, hood, pumps, valves, and control panel. Furnishing and installing new ductile iron piping inside the pump wetwell. Placing compacted fill around the wetwell to raise the grade. Grading a drainage ditch and placing rip-rap. Placing gravel surfacing at the site. Electrical distribution and installation. Wastewater flow handling. Installing new chain link fencing with two gate leaves.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents