Similar Projects
Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Excavated Point Repairs
Post-Bid
Hollywood, FL 33022

Civil Work Related to Taft Street Force Main Condition Assessment
Post-Bid
Hollywood, FL 33022

Sanitary Sewer/ Storm Drain Maintenance and Repair
Term Contract
Results
Lauderdale-by-the-Sea, FL 33308

Sanitary Sewer Manhole Rehabilitation, Annual Contract
Term Contract
Results
Pompano Beach, FL 33060

Infiltration and Inflow Removal Phase 2A Lateral Repairs
Post-Bid
Hallandale, FL 33009

Mecca Force Main Extension Project
Results
Fort Lauderdale, FL 33301

Lyons Park Stormwater and Wastewater Improvements
Post-Bid
Pompano Beach, FL

Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Cured-In-Place Pipe (CIPP Lining)
Results
Hollywood, FL 33022

Sanitary Sewer Lateral Connection and Lateral Pipe Product
Post-Bid
Plantation, FL

Septic Tank Elimination Program
Results
Less than $1,700,000 est. value
Fort Lauderdale, FL 33301

Maintenance, Repair and Install of Plumbing Systems and Lift Stations-Along Florida's Turnpike System
Results

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

Northwest 13th Street Phase I Force Main Replacement - Design Build P12388
Results
Less than $2,450,000 est. value
Fort Lauderdale, FL 33301

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Storm Sewer and Sewer Main Cleaning and Repairs
Term Contract
Results
Sunrise, FL 33351

Reported 08/18/2020 01:29 PM
Project Title

Wastewater Air Release Valves Maintenance

Physical Address View project details and contacts
City, State (County) Weston, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all materials, labor, supervision, mobilization, machinery, supplies, tools, maintenance of traffic, worksite safety measures, overhead/indirect expenses, profit and all other incidentals necessary to perform maintenance of Wastewater Air Release Valves (ARV) at various locations in the CITY of Weston. Each ARV must be cleaned, tested and put back into service. The ARV’s must be disassembled; cleaned to remove accumulated grease and debris; reassembled; and put back into service. Contractor shall have self-contained vacuum unit or equivalent equipment to perform such work. The ARV’s are cleaned on an annual basis, or more frequently if needed. The term for this bid shall be for three (3) years with two optional three (3) year renewal terms by mutual consent, in writing, prior to the expiration of the current term. The quoted rates shall be adjusted annually by the Consumer Price Index (CPI). Work shall be performed in accordance with Summary of Work stated herein. A minimum of 5-years experience performing similar maintenance work is required. OSHA Certification for Construction Confined Space Entry is required.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents