Similar Projects
Combined Maintenance Facility - C114 - City of Aurora
New Construction, Infrastructure
Conception
$31,506,000 CJ est. value
Aurora, IL 60506

Pacifica Riverview
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Aurora, IL 60506

100 N. Broadway
New Construction, Infrastructure - 331,863 SF
Design
$70,000,000 CJ est. value
Aurora, IL 60505

Aurora Central Catholic High School STEM Building
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Aurora, IL 60506

Renovate Building and Construct Storage Building in Naperville and Elgin - General Construction
New Construction, Renovation, Infrastructure - 3,200 SF
Bidding
$800,000 CJ est. value
Elgin, IL 60120

Renovate Building and Construct Storage Building in Naperville and Elgin - General Construction
New Construction, Renovation, Infrastructure - 3,200 SF
Bidding
$800,000 CJ est. value
Elgin, IL 60120

Hough Street ES and Sunny Hill ES
Renovation
Post-Bid
Barrington, Carpentersville, IL 60010

Cafeteria Expansions
Addition
Post-Bid
Elgin, IL 60124

Windmill Cove Directional Boring and Cable Replacement
Infrastructure
Results
Batavia, IL

Concrete - Various Sites District Wide Plus Alternative Work
Alteration
Results
Algonquin, Carpentersville, IL 60102

Mooseheart Activity Center
Addition
Construction
Mooseheart, IL 60539

Resilience Education Center - Phase 2
Renovation - 31,218 SF
Construction
$5,000,000 CJ est. value
Aurora, IL 60505

FONA International Manufacturing
Addition - 15,620 SF
Pending Verification
Geneva, IL 60134

Flora Arbor Cannabis Growing Facility
Build-Out - 56,173 SF
Pending Verification
Elgin, IL 60123

Raymond Street Culvert Rehabilitation
Infrastructure
Design
$244,000 CJ est. value
South Elgin, IL 60177

Last Updated 03/17/2023 09:13 AM
Project Title

Aries Gonzalez Child Center Storage Building

Physical Address View project details and contacts
City, State (County) Aurora, IL 60505   (Kane County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $339,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 17, 2023 project has is on hold. Prevailing wage rates shall apply to this Project. Each bid must conform and be responsive to all pertinent bidding and contract documents including Contractor qualifications as specified in said documents. Background 1. The intent of this project is to construct a new 960 sf, storage building for the East Aurora School District. The structure is slab on grab frame-built structure with three overhead doors and is constructed on the Northeast side of the existing Aries Gonzalez Child Center property. C. The Work of Project is defined by the Contract Documents and consists of the following: 1. Perform and complete all work as required by and in accordance with the conditions of contract, drawings, specifications, and specifics below. The Scope of Work includes: furnishing all supervision, insurance, fees, permits, bonds, labor, material, equipment, tools, utility services coordination, testing, called inspections, facilities and services necessary, inherent or incidental to perform the installation of the work as summarized below and in accordance with the drawings, specifications, schedules and other Contract Documents.

Details

1 Story Above Grade, 973 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents