Similar Projects
Repair/Maintain Airfield Stormwater System Phs II, FGWB 04-0014P2A and FGWB 04-0014P2B
Design
$5,000,000 to $10,000,000 est. value
Marietta, GA

FGWB 14-0014P2A, Maintain Airfield Stormwater System Phase II & FGWB 14-0014P2B Repair Stormwater System Phase II
Post-Bid
$5,000,000 to $10,000,000 est. value
Marietta, GA

Lowe's #545
Post-Bid
Marietta, GA 30064

GC Services for Peachtree MS Site Access Improvements
Results
Less than $1,000,000 est. value
Atlanta, Dunwoody, GA 30338

Parking Lot Project –Hotel Avenue, Murray Avenue and Jackson Way Extension
Results
Powder Springs, GA

Amazon Parking Lot Expansion
Construction
Smyrna, GA

CDBG - Kennesaw Heights Subdivision
Post-Bid
Kennesaw, GA 30144

Kennesaw Mountain - Chattahoochee River Trail at 5 Locations
Results
Marietta, GA 30060

RaceTrac
New Construction
Post-Bid
$500,000 est. value
Marietta, GA 30064

Harrison Park Parking Improvements and Swingtime Access Road
Results
Marietta, GA 30066

Statewide Drainage Asset Management Program
Post-Bid

West Wieuca Trail
Results
Atlanta, GA

Construct and Repair Outfall 9 Culvert at Poorhouse Creek and Windy Hill Road
Post-Bid
Marietta, GA 30069

Parking Lot Addition - Mt. View Community Center
Results
Marietta, GA 30066

GT Task Order - Academy of Medicine ADA Upgrades
Post-Bid
Atlanta, GA 30308

Last Updated 11/02/2020 09:15 AM
Project Title

CDBG - Curb, Gutter, Stormwater on Kennesaw Heights Subdivision

Physical Address View project details and contacts
City, State (County) Kennesaw, GA 30144   (Cobb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Curb and gutter and storm line construction within the Kennesaw Heights Subdivision. Work includes furnishing all labor, material, and equipment required for the project.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents