Similar Projects
Last Updated | 09/16/2022 02:35 PM |
Project Title | 2022 State Line Road |
Physical Address | View project details and contacts |
City, State (County) | Blaine, WI 54830 (Burnett County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | State Line Road Project. State Line Road Project Consists of, but Not Limited to: o Removal of Existing Concrete Slab - 200.0 Cy o Removal and Disposal of 48" Culvert - 3.0 Ls o Install Cofferdam - 1.0 Ls o Relocate Cofferdam - 2.0 Ea o Mobilization -1.0 Ls o Traf C Control 1.0 (Road Will Be Closed) o Culvert Bedding Open Graded Base Aggregate - 44.4 Cy o Roadway Surface (3/4" Dense Graded Base) -44.4 Cy o Replace 12" Concrete Apron - 400.0 Sy o Erosion Control - 1 Ls o Dewatering - 1 Ls o Turbidity Barriers - 99.7 Sy o Zoning/ Culvert Permit Plans and Submittals - 1 Ls o 5'x12'x30' Box Culverts, W/endwalls -2.0 Ea o 5'x12'x30' Box Culvert Installation - 2.0 Ea o Embankment Material (1 1/4" Dense Graded Base) - 475.0 Cy o Heavy Riprap -296.3 Cy |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |