Similar Projects
Last Updated | 03/25/2021 02:27 PM |
Project Title | Governor Charley E. Johns Conference Center Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Starke, FL 32091 (Bradford County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $69,579 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor to retro-fit the existing roof system at the Governor Charley E. Johns Conference Center located at 1610 North Temple Avenue, Starke, Florida 32091. 1. Prepare existing roof to receive retrofit roof system; 2. Delete abandon vents in roof and patch substrate with suitable material; 3. Loose lay custom sized pan filler in between the panel seems to provide a smooth surface for the rest of the roof covering installation; 4. Install wood blocking at eaves and rake and mechanically attach the structure; 5. Cut back metal panel that overhangs into the cutter to allow for proper water flow; 6. Mechanically attach 1 /4” gypsum fire retardant underlayment boards over the pan filler; 7. Mechanically attach 60mil Thermoplastic Polyolefin (TPO) single ply membrane (white); 8. Custom Fabricate and install TPO clad metal eave and rake perimeter edge flashings (standard color); 9. Heat weld the TPO to form monolithic assembly to cover entire roof, 10. Flash all roof penetrations in general compliance with manufacturer’s recommendations; 11. Clean up and properly dispose of all roofing related debris; 12. Manufacturer’s inspection and grading upon completion; 13. Provide 20-year no dollar limit warranty for materials and labor; 14. Make sure steps are taken to remove moisture from direct contact with metal roofing before new roofing installation occurs, and provide protection from condensation build up between metal roofing and new roofing surface installation; and 15. Contractor is responsible for filing appropriate permits. 16. Provide and install 8” gutters on all eaves that have an existing gutter together with a 5”x6” downspout no greater than 30 feet. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |