Similar Projects
Facility Reroofing - FSU Campus Dining and Kitchen Renovation
Post-Bid
Tallahassee, FL

Belle Glade Senior Center
Post-Bid
Belle Glade, FL 33430

Roofing IDIQ
Renovation
Results
Hurlburt Field, FL 32544

Roof Replacement of Various City Wide Buildings
Results
Less than $900,000 est. value
Pembroke Pines, FL

Construction Management Services Mowat Middle School Media Center Rebuild and Reroof
Construction
Lynn Haven, FL 32444

Building 0092 Physics Re-Roof Phase 2
Post-Bid
Gainesville, FL 32610

FAMU Viticulture Re-Roofing
Results
Tallahassee, FL

Re-Roofing of North Fort Myers High School
Post-Bid
Fort Myers, FL 33903

TGK Facility Re-Roof - Pressure Wash and Seal Exterior Building
Results
Less than $3,350,000 est. value
FL

Membrane Roof Rehabilitation Deland Police Department Building
Post-Bid
Less than $100,000 est. value
De Land, FL 32720

Fire Department Reroofing Project
Results
Crystal River, FL 34428

Union Academy Upgrade-Replace Roof Building 2 (Cafeteria)
Post-Bid
Bartow, FL 33830

Eustis Fisheries Research Lab Reroof Project
Results
Less than $187,000 est. value
Eustis, FL

Emergency Hurricane Roof Repair Tyndall Elementary School
Post-Bid
Panama City, FL 32400

Hardening and Retrofitting of the City Hall
Results
Less than $340,000 est. value
Tavares, FL

Last Updated 03/25/2021 02:27 PM
Project Title

Governor Charley E. Johns Conference Center Roof Replacement

Physical Address View project details and contacts
City, State (County) Starke, FL 32091   (Bradford County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $69,579
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to retro-fit the existing roof system at the Governor Charley E. Johns Conference Center located at 1610 North Temple Avenue, Starke, Florida 32091. 1. Prepare existing roof to receive retrofit roof system; 2. Delete abandon vents in roof and patch substrate with suitable material; 3. Loose lay custom sized pan filler in between the panel seems to provide a smooth surface for the rest of the roof covering installation; 4. Install wood blocking at eaves and rake and mechanically attach the structure; 5. Cut back metal panel that overhangs into the cutter to allow for proper water flow; 6. Mechanically attach 1 /4” gypsum fire retardant underlayment boards over the pan filler; 7. Mechanically attach 60mil Thermoplastic Polyolefin (TPO) single ply membrane (white); 8. Custom Fabricate and install TPO clad metal eave and rake perimeter edge flashings (standard color); 9. Heat weld the TPO to form monolithic assembly to cover entire roof, 10. Flash all roof penetrations in general compliance with manufacturer’s recommendations; 11. Clean up and properly dispose of all roofing related debris; 12. Manufacturer’s inspection and grading upon completion; 13. Provide 20-year no dollar limit warranty for materials and labor; 14. Make sure steps are taken to remove moisture from direct contact with metal roofing before new roofing installation occurs, and provide protection from condensation build up between metal roofing and new roofing surface installation; and 15. Contractor is responsible for filing appropriate permits. 16. Provide and install 8” gutters on all eaves that have an existing gutter together with a 5”x6” downspout no greater than 30 feet.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents