Similar Projects
Waterplant Filter Rehab - City of Social Circle
Renovation
Conception
$1,200,000 CJ est. value
Social Circle, GA 30025

Wastewater Expansion Construction (Parallel Plant) - City of Flowery Branch
Addition, Demolition, Infrastructure
Conception
$20,034,002 CJ est. value
Flowery Branch, GA 30542

Barber Creek Water Reclamation Facility (WRF) System Upgrades - Phase 2 - Construction - Barrow County
Renovation
Design
$5,173,231 CJ est. value
Winder, GA 30680

Water Treatment Plant Rehabilitation
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Marshallville, GA 31057

Towaliga Water Treatment Plant Renovations
Infrastructure, Renovation
Bidding
$600,000 CJ est. value
Locust Grove, GA 30248

Wastewater Treatment Facility Upgrades
Renovation, Infrastructure
Post-Bid
$200,000 CJ est. value
Waycross, GA 31501

WWTP Improvements Contract A
Renovation, Infrastructure
Post-Bid
$9,800,000 CJ est. value
Hartwell, GA 30643

Upgrades to Hemphill Pump Station
Renovation, Infrastructure
Results
$13,771,047 CJ est. value
Atlanta, GA 30334

Joiner Road Water Treatment Facility Well No 4
New Construction, Infrastructure
Results
$3,260,000 CJ est. value
Tennille, GA 31089

RFP Construction Manager at Risk - North Bryan County Water Reclamation Facility
Renovation, Infrastructure
Construction
$900,000 CJ est. value
Ellabell, GA 31308

Sewer Plant Expansion - City of Flowery Branch
Renovation, Infrastructure
Pending Verification
$700,000 CJ est. value
Flowery Branch, GA 30542

Wastewater Treatment Plant Upgrades - City of Douglas
Renovation
Pending Verification
$3,000,000 CJ est. value
Douglas, GA 31535

Treatment Plant Expansion - City of Savannah
Addition, Demolition, Renovation, Infrastructure
Conception
$7,460,000 CJ est. value
Savannah, GA 31401

Dawson Forest WRF Phase I Upgrade and Expansion to 1.25 MGD
Renovation, Infrastructure
Bidding
$7,500,000 CJ est. value
Dawsonville, GA 30534

Waste Water Treatment Plant Process Equipment
New Construction
Post-Bid
Buena Vista, GA

Last Updated 10/16/2023 05:31 PM
Project Title

Waste Water Treatment Plant Improvements - Phase III

Physical Address View project details and contacts
City, State (County) Thomson, GA 30824   (McDuffie County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $13,429,992 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Waste Water Treatment Plant Improvements - Phase III Certified Disadvantaged Business Enterprises (DBE) including MBE and WBE

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents