Project Title | NAWS Intake and Snake Creek Pumping Plant Modifications Demolition (Contract 6-1A) |
Physical Address | View project details and contacts |
City, State (County) | Coleharbor, ND 58531 (McLean County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $34,163,900 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rejected Buildings Rehabilitation/Renovation, Sanitary Sewer (Gravity), Safety Improvements, Buildings/Public, Electrical and Controls, Communication Facilities/Network, Electrical Equipment & Supplies, Sewer Force Main, Culverts, Waterways, Stormwater Channels, Construction, Seismic Upgrades, Sewer Pump Station, Sidewalks/Curbs/Gutters, Electrical Installation/Construction, Elevated - Ground Storage Tanks, Fittings and Valves, Underwater Construction/Repair/Maintenance, Fencing/Guardrails/Handrails, Rubblizing/Cracking and Seating, Irrigation, Erosion Control - Temporary, Landscaping - Seeding, Light, Heat, Power, Portable Toilets, Materials, Equipment and Supplies, Lift Stations/Lift Station Equipment, Miscellaneous, Plumbing, Waterlines, Pipe Lining, Dams/Reservoirs, Mechanical Systems, Security/Monitoring Systems, Sewer and Water Construction, Waterproofing, Water and Wastewater Facilities, Signage, Water Infrastructure (Water Meters), Flooring/Carpeting, Water Utilities, Instrumentation, Water Transmission Pipelines, Audio/Video, Concrete/Formed/Flatwork/Foundation, Concrete Walkway, Electrical, Walkway/Passage/Corridor, Guardrails/Attenuators/End Treatments, Heating, Ventilation, Air Conditioning (HVAC), Crack Sealing Repair and/or Maintenance, Removal and Replacement of pipe, Welding, Conduit/Electrical/Telemetry, Jack and Bore / Sewer / Water Construction, Meter Vault Improvements, Sewer Re-Lining, Painting, Rescue/Training/Trench/Prop, Pumps or Pump stations, Water/Wastewater Infrastructure, Water Resources Infrastructure, Concrete Repair , Buildings Commercial and Private . In accordance with North Dakota Century Code Chapter 48, the project must be comprised of multiple bids. There are 4 contracts: Contract No. 1 - General Construction; Contract No. 2 - Mechanical Construction; and Contract No. 3 - Electrical Construction; which may be bid separately. A combined construction Contract, Contract No. 4 - Combined General, Mechanical, and Electrical Construction, which includes all Work, may also be bid. The contract(s) may be awarded to the lowest responsive and responsible bidder(s). The sum of Contracts 1, 2, and 3 will be compared to Contract 4 to determine the lowest bid. If Contracts 1, 2, and 3 are awarded, the General Construction Contractor will assume responsibility for coordinating the work of the prime contractors responsible for Contracts 2 and 3. The scope of Work for each Contract generally consists of the following: CONTRACT NO.1 - GENERAL CONSTRUCTION Construction work includes: Construction of new Northwest Area Water Supply (NAWS) raw water pumpstation inside the existing United States Bureau of Reclamation (USBR) Snake Creek Pumping Plant (SCPP) with Owner's pre-procured equipment, including 4 vertical turbine pumps, interior piping in sizes ranging from 1-inch to 54-inches located inside SCPP and 11' diameter SCPP discharge tunnel, valves, actuators, meters, supports, pump and surge control systems including two surge tanks, and other miscellaneous work. Work for the NAWS temporary intake includes installation of intake screens and attachment of intake bulkhead to SCPP. Work for the NAWS raw water pumpstation inside SCPP includes construction of new concrete floors, beams, and structural steel for installation of the NAWS raw water pumpstation. Work for the NAWS discharge pipeline includes installation of new piping and supports in the existing discharge tunnel. CONTRACT NO.2 - MECHANICAL CONSTRUCTION Construction work includes: Plumbing and HVAC work to modify the existing plumbing and HVAC in SCPP for the new NAWS raw water pumpstation. New HVAC system includes air handler unit, ductwork, and miscellaneous work. CONTRACT NO.3 - ELECTRICAL CONSTRUCTION Construction work includes: Installation of electric motors and variable frequency drives (VFDs) for new vertical turbine pumps, instrumentation, PLC/PC based control systems, control consoles, MCCs, starters, generator, transfer switch, transformer, general control electrical work, and other miscellaneous Work. CONTRACT NO.4 - COMBINED GENERAL, MECHANICAL, & ELECTRICAL CONSTRUCTION Construction work includes: All work associated with Contracts 1, 2, and 3 combined. The electronic reproductions of the Contract Documents may also be viewed free of charge online at www.houstoneng.com, or downloaded for a fee of $25.00, by December 15, 2022. Please contact Houston Engineering at 701-323-0200 if you have any questions about viewing or downloading the documents. The Advertisement for Bids, Planholders List, Addendums, and Bid Results will be available from the "Bid Info" link located on the Houston Engineering, Inc. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |