Similar Projects
Andover Municipal Parking Hub - Town Hall Andover
Infrastructure
Conception
$350,000 CJ est. value
Andover, CT 06232

Andover Municipal Parking Hub - Town Hall Andover
Infrastructure
Conception
$350,000 CJ est. value
Andover, CT 06232

Tolland Fire Department Replacement of Stations - 440
Demolition, New Construction, Infrastructure - 4,600 SF
Design
$5,000,000 CJ est. value
Tolland, CT 06084

Public Works Facility - Town of Hebron
New Construction, Infrastructure - 17,800 SF
Design
$8,000,000 CJ est. value
Hebron, CT 06248

RFQ D/B - Mansfield Apartments Redevelopment
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Storrs Mansfield, CT 06268

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Civil, Site and Structural Improvements for Installation of the Second Track and New Maintenance of Way Yard
Alteration
Post-Bid
Windsor, CT 06095

Intersection Improvements at Swamp Road and Boston Turnpike
Infrastructure
Results
Coventry, CT 06238

Tasker Retaining Wall Replacement
Infrastructure
Results
$798,863 CJ est. value
Storrs Mansfield, CT 06269

New Softball Complex - Miller Richardson Park - Town of Coventry
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Coventry, CT 06238

Able Coil and Electronics Co Expansion
Addition, Demolition, Infrastructure - 12,000 SF
Pending Verification
$1,500,000 CJ est. value
Bolton, CT 06043

Willington Fire Department
Addition, Demolition, Infrastructure
Design
$1,750,000 CJ est. value
Willington, CT 06279

RFQ Construction Manager at Risk - South Campus Infrastructure
New Construction, Renovation, Infrastructure
Post-Bid
$62,500,000 CJ est. value
Storrs Mansfield, CT 06269

CT Route 89 and CT Route 195 Intersection Improvements
Infrastructure
Results
$397,340 est. value
Mansfield, CT 06250

Scranton Powersports Warehouse
New Construction, Infrastructure - 9,600 SF
Pending Verification
$1,000,000 CJ est. value
Vernon Rockvl, CT 06066

Last Updated 01/20/2023 06:34 AM
Project Title

Rotary Upgrade to a Modern Roundabout and Traffic Signal and Railroad Upgrades on Spring Street

Physical Address View project details and contacts
City, State (County) Stafford Springs, CT 06076   (Tolland County)
Category(s) Heavy and Highway, Outdoor Lighting, Transportation
Sub-Category(s) Maintenance, Paving/Reconstruction, Railroad/Subway, Roadway Lighting, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,134,630 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

State Project Number(s) and Description: Project Nos. 134-148 & 134-152; Rotary Upgrade to a Modern Roundabout and Traffic Signal and Railroad Upgrades on Spring Street in the Town of Stafford Required Prequalification Work Classification(s): Group No. 6 Road Construction and Rehabilitation: Local Roads and Streets and non-freeways Federal-aid Project Number(s) and Funding Source: FHWA (F.A.P. Nos. 000T(303) and 1134(110)) Pre-Bid Conference and/or Site Visit Information: N/A District Number(s) : 1 - Rocky Hill l Contract DBE % Goal or SBE % Set-Aside: DBE 8% Project Scope Code: F - $ 2,500,000 - $ 4,999,999 Completion Date : 327 Calendar Days Liquidated Damages Rate: 1,200.00 Days DBE Submittal Requirements - The two (2) lowest bidder's DBE Commitment Approval Request form(s) meeting the established DBE contract goal percentage or Good Faith Effort (GFE) Application Request including all "backup" documentation, as applicable, are due to the Department no later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the DBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. SBE Submittal Requirements - The low bidder's SBE Commitment Approval Request form(s) meeting the established SBE set-aside percentage or Request for Waiver application are due to the Department no 736later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the SBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. Prequalification Requirements: Prospective bidders must be prequalified with the Department of Transportation and have on file a sworn Statement (CON 16) by the time of the bid. In order to help ensure that prospective bidders may become prequalified in time for the bid opening for a given contract, contractors should be certain to return the Prequalification Application (CON 16) with all necessary information, signatures and notarized documents, to the DOT Contracts Unit at least thirty (30) calendar days before requesting a bid proposal form for that contract. Bid Proposal Forms: All prospective bidders requesting to obtain the official Bid Proposal Form must submit a completed Bid Proposal Request Form (Part C) to the DOT Contracts Unit per the above instructions. If the Bid Proposal Request Form (Part C) and the Contractor Prequalification Application are found to be satisfactory, the bidder will receive an email response from the Department instructing the bidder to download the electronic Bid Proposal Form Bid Bond Security: Except when otherwise specified in the bid documents, no proposal will be considered unless; (a) it is accompanied by a proposal guaranty from a surety company in the form of the Department s (CTDOT) standard bid bond form furnished by the Department, as may be revised, satisfactory to the Commissioner, in an amount equal to at least 30% of the amount of the bid; or (b) the bidder has on file in the Contract Section a current Department (CTDOT) standard annual bid bond form, satisfactory to the Commissioner, on the form furnished by the Department. DOT encourages bidders to file an Annual Bid Bond with the Department so that the bidder does not have to submit a bid bond each time they bid on a specific project/proposal. At the time of the bid opening, the surety must be a corporate surety licensed by the Insurance Commissioner of the State of Connecticut and must hold a Certificate of Authority as an acceptable Surety and/or Reinsuring Company acceptable to the Federal Department of Treasury. The surety's underwriting limitation must not be less than the full amount required by the bond itself. Pre-Bid Questions and Answers: Questions pertaining to DOT advertised construction projects must be presented through the CTDOT Pre-Bid Q and A Website. The Department cannot guarantee that all questions will be answered prior to the bid date. Please Note - at 9:00 am Monday (i.e. typical Wednesday Bid Opening) the project(s) being bid will be closed for questions, at which time questions can no longer be submitted through the Q and A Website. Answers may be provided by the Department up to 12:00 noon, the day before the bid. At this time, the Q and A for those projects will be considered final, unless otherwise stated and/or the bid is postponed to a future date and time to allow for further questions and answers to be posted. If a question needs to be asked the day before the bid date, please contact the Contracts Unit staff and email your question to dotcontracts@ct.gov immediately. Prevailing Wage Rates: The minimum rates to be paid labor of the various classifications shall be in accordance with current schedule of wages established by the State Labor Commissioner as provided in the Connecticut General Statutes, as revised. The Contract Wage Certification Form is to be submitted to the Labor Commissioner before the award of the contract. The Department, prior to the awarding of any contract, may require further financial and other information from any applicant who becomes the low bidder for that contract. The Commissioner of Transportation reserves the right to reject any and all bids. CTDOT - Rotary Upgrade to a Modern Roundabout and Traffic Signal and Railroad Upgrades Spring Street *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 0134-0148, 0134-0152

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents