Similar Projects
Age-Restricted Residential Development
New Construction
Conception
Clarksville, MD

Snowden River/Broken Land Intersect - J4167 - Howard County
Infrastructure
Conception
$2,495,000 CJ est. value
Columbia, MD 21046

Tiber / Sucker Branch Interceptor Improvements - S6283 - Howard County
Renovation, Infrastructure
Design
$12,660,000 CJ est. value
Clarksville, MD 21029

Erickson Living at Limestone Valley
New Construction, Infrastructure
Design
$380,000,000 CJ est. value
Clarksville, MD 21029

Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value

Ellicott City North Tunnel Project - Howard County
Infrastructure
Post-Bid
$70,000,000 CJ est. value
Ellicott City, MD 21043

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

High Friction Surface Treatment of Roadways at Various Locations - Statewide
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Park View at Ellicott City II
Renovation - 78,608 SF
Construction
Ellicott City, MD 21043

Hickory Ridge Place
Renovation - 110,796 SF
Construction
$20,000,000 to $25,000,000 est. value
Columbia, MD 21044

Lakefront District Residential North
New Construction
Pending Verification
Columbia, MD 21044

Autism Society Units
New Construction
Pending Verification
Columbia, MD 21044

Guilford Road (US1 to Dorsey Run Road) - J4181 - Howard County
Infrastructure
Conception
$6,500,000 CJ est. value
Columbia, MD 21046

Villages at Town Square - Phase 3
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Ellicott City, MD 21042

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Post-Bid
$2,500,000 est. value

Last Updated 04/10/2023 03:13 PM
Project Title

Brown Begone

Physical Address View project details and contacts
City, State (County) Daniels, MD 21043   (Howard County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $45,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of age restricted units on 2.6 acres on the northside of the Pike and northeast of Valley Lane. Scope details have not been released. As of April 10, 2023 the project is in early planning stage. A formal planning application has not been submitted to Howard County. A pre-submission community meeting was held on August 30, 2022. Information regarding the architect and general contractor has not been disclosed. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2024.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents