Similar Projects
Center Hill Lake Recreation Area Paving at Floating Mill Campground
Infrastructure
Design
$500,000 CJ est. value
Silver Point, TN 38582

Underground Directional Boring
Infrastructure
Post-Bid
Cookeville, TN

Upperman High School Baseball Field Improvements
Infrastructure
Post-Bid
$14,000,000 CJ est. value
Baxter, TN 38544

New Expo Center-Fairgrounds Complex Site Preparation
Infrastructure
Results
$625,000 est. value
Cookeville, TN

Demolition and Abatement
Demolition, Infrastructure
Construction
Cookeville, TN 38501

Lone Oak Townhomes
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Cookeville, TN 38501

Ridgedale Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Cookeville, TN 38501

TTU New Tucker Stadium West
New Construction, Infrastructure - 87,000 SF
Post-Bid
$25,200,000 CJ est. value
Cookeville, TN 38501

Timberwalk Subdivision
New Construction, Infrastructure
Pending Verification
$124,000,000 CJ est. value
Cookeville, TN 38506

RFP Design - New Aquatics Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Cookeville, TN 38501

Saxony Phase IV
New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
Cookeville, TN 38501

Upperman High School Expansion
Addition, Demolition, Infrastructure
Post-Bid
$4,688,900 CJ est. value
Baxter, TN 38544

Nelson Townhomes
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Cookeville, TN 38501

Edgar Evans DM Courtesy Dock Replacement
Infrastructure
Post-Bid
$7,055,397 CJ est. value
Silver Point, TN 38582

Callie Square
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Cookeville, TN 38506

Last Updated 03/08/2023 12:43 PM
Project Title

TDEC (Tennessee Department of Environment and Conservation) Cummins Falls Pond Liner

Physical Address View project details and contacts
City, State (County) Cookeville, TN 38501   (Putnam County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $25,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Remove vegetation, prepare surface grade and slopes, install 2'x2' anchor trench that is 2' above water level, and install a 40 MIL High Density Polyethylene (HDPE) Liner Site visits should be completed prior to the questions and comments deadline on february 21 This project must be completed during the time of March 15 th to April 30th , unless other agreement has been approved by Facilities Management, MTRO.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents