Similar Projects
Automated Metering Infrastructure
Bidding
Temple, GA

Pump Station 2002 Force Main Replacement
Renovation, Infrastructure
Bidding
Brunswick, GA

Water System Improvements
Post-Bid
Less than $1,050,000 est. value
Pavo, GA 31778

Water System Improvements
Post-Bid
Dahlonega, GA 30533

Social Circle 2020 Water System Upgrades
Results
Social Circle, GA 30025

Fire Hydrant and Gate Valves
Results
Atlanta, GA 30303

Scott Boulevard Phase II Watermain Replacement
Infrastructure
Bidding
GA

Provision of Inspection and Repair Services for Fire Hydrants on an Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30042

FY20 Water and Sewer Supplies
Results
Douglas, GA 31533

SR 9 Sidewalk and Dahlonega Water Main
Infrastructure
Bidding
Dahlonega, GA

Polyethylene Pipe Replacement Project
Post-Bid
Lawrenceville, GA 30046

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Annual Contract for Meter Installations and Repairs
Term Contract
Bidding
Atlanta, GA

Water and Sewer Indefinite Quantity Mechanical Contractor
Post-Bid
Less than $2,000,000 est. value
Cumming, GA 30040

Water Meter Replacement and AMA Upgrade - DWSRF 19-013
Results
Less than $728,392 est. value
Montezuma, GA 31063

Last Updated 11/02/2021 01:42 PM
Project Title

Juliette Water Project Contract 2 Phase 2

Physical Address View project details and contacts
City, State (County) GA   (Monroe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the installation of a Water System outlined below: Install approximately 4,040 linear feet of 12 inch water main, 31,380 linear feet of 8 inch water main and 1,630 linear feet of six inch water main along with associated hydrants, valves, fittings, joint restraints, jack & bore casings, clearing, erosion control and connection to the water system at several points along SR 87.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents