Similar Projects
Scott Candler WTP Electrical Building No. 2 Structural Design Improvements And Distribution System Panels Installation
Renovation
Bidding
Doraville, Tucker, GA 30360

Contract 2 - Water Plant Improvements and Concrete Rehabilation
Renovation, Alteration
Bidding
$650,000 est. value
Woodbury, GA

Riverside Drive WTP High Service Pump No. 7
Post-Bid
Gainesville, GA 30501

Water Treatment Services (Annual Contract)
Term Contract
Post-Bid
Savannah, GA 31401

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Crosstown Raw Water Pump VFD Replacement
Results
Less than $37,150 est. value
Peachtree City, GA 30269

Terry R. Hicks Water Production Plant Liquid Lime System
New Construction
Bidding
Jonesboro, GA 30236

Loopers WTP Dewatering Facilities Upgrade
Post-Bid
Dalton, GA

Withlacoochee WWTP Secondary Equalization Basin
Results
Valdosta, GA 31601

Water Treatment Plant Rehabilation
Renovation
Bidding
Marshallville, GA

2019 Water Pollution Control Facilities Rehabilitation Academy Creek BGJWSC
Post-Bid
Brunswick, GA 31520

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Results
Less than $748,665 est. value
Cedartown, GA

Industrial Park Division 1 - Water Treatment Plant
Post-Bid
Warner Robins, GA

Water Treatment Plant #1 Aerator Replacement
Results
Kingsland, GA 31548

Bear Branch Water Supply and Treatment Facility
Post-Bid
GA

Last Updated 10/04/2021 05:35 AM
Project Title

Progressive Design/Build Servicesforthe Dunbar Creek WPCF Rehabilitation

Physical Address View project details and contacts
City, State (County) Saint Simons Island, GA 31522   (Glynn County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope :The project contemplated for these services is described as the Dunbar Creek WPCF Rehabilitation whose components are further described in Attachment D - Project Technical Requirements. The Owner owns and operates the Dunbar Creek WPCF to treat collected wastewater from the residents and businesses of St. Simons Island in compliance with applicable permitting and regulations. The Project contemplated herein will specifically involve improvements for RAS flow control, aeration systems, aeration control, clarification capacity, UV disinfection capacity, tertiary filtration capacity, odor control, wastewater reuse systems, and entrance roadway improvements. Permit modifications with the Georgia Environmental Protection Division will also be required.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents