Similar Projects
Driveway Sealing and Striping
Post-Bid
Madison, NH 03849

Crack Sealing
Infrastructure
Post-Bid
Wolfeboro, NH

2021 Road Program - Chip Seal
Results
Moultonborough, NH

Roadway Resurfacing
Results
$2,154,984 est. value

Driveway Replacement
Infrastructure
Post-Bid
Freedom, NH 03836

2021 Road Program - Roadway Rehabilitation, Reconstruction, and Paving
Results
Moultonborough, NH

Paving of Sidewalks Adjacent to Taylor Way
Infrastructure
Post-Bid
$400,000 est. value
Wakefield, NH 03872

Pavement Resurfacing District I
Infrastructure
Results
$5,272,746 est. value

Bonnyman Road Resurfacing
Infrastructure
Results
Wakefield, NH 03888

Snow Road Paving Project
Infrastructure
Results
Effingham, NH 03882

MWVTA Multi-Use Pathway
Infrastructure
Results
Conway, NH

Pavement Preservation of NH 16
Infrastructure
Results
$3,512,678 est. value
Ossipee, Wakefield, NH

Maplewood Subdivision Roadway Reconstruction Project
Infrastructure
Results
Wolfeboro, NH 03894

Districts 2 and 3 Resurfacing
Infrastructure
Results
$3,881,637 est. value

Green Mountain Road Paving
Infrastructure
Results
Effingham, NH 03882

Last Updated 09/13/2022 01:38 PM
Project Title

Sidewalk Reconstruction

Physical Address View project details and contacts
City, State (County) Wolfeboro, NH 03894   (Carroll County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Wolfeboro is requesting bids for sidewalk reconstruction in 3 separate locations within the Town of Wolfeboro. Stantec used NHDOT item numbers to produce the bid schedule attached to this memo. Below is a brief summary of the work at each location. The proposed sidewalk work is located at: North Main Street - Near the Wolfeboro Inn Central Ave Extension - Depot Square Condominiums South Main Street -At Morrisseys Restaurant Remove the existing bituminous sidewalk and brick pavers (salvage brick pavers to the Wolfeboro Inn). The work will take place from the concrete tip down at Sewall Road and end at the entrance to the Meredith Village Savings Bank, approximately 205 LF of new sidewalk. Retain the existing vertical granite curbing. Approximately 20 LF of granite curbing will need to be removed and reset. The Town of Wolfeboro will furnish the missing pieces of curbing. Place 6” of NHDOT Crushed Gravel and 3” of NHDOT bituminous sidewalks. The new sidewalk widths shall match the existing widths. The proposedbituminous sidewalks must match the adjacent walkways in all locations. Any disturbance to the existing landscaping shall be returned to its original condition. The Contractor shall provide traffic control through the work zone at all times. The Contractor must maintain pedestrian access to the businesses at all times. Any existing striping that is disturbed dueto the sidewalk/curbing installation will be re-painted by the Town of Wolfeboro. Remove the existing stamped bituminous sidewalk. Remove and reset the existing vertical granite curbing. The limit of new sidewalks will match the existing concrete sidewalks at Depot St, approximately 165 LF of new sidewalk and curbing. Place 8” of NHDOT Crushed Gravel and 4” of NHDOT Class A reinforced concrete sidewalks. The proposed sidewalks will receive only a broom finish, no stamped concrete will be allowed. The new sidewalk widths shall match the existing widths. The stamped bituminous sidewalk at the stair at the main entrance shall remain and be sawcut to match the new concrete sidewalks. Any disturbance to the existing landscaping shall be returned to its original condition. The Contractor shall provide traffic control through the work zone at all times. The Contractor must maintain pedestrian access to the building at all times. Any existing striping that is disturbed due to the sidewalk/curbing installation will be re-painted by the Town of Wolfeboro. Remove the existing bituminous sidewalk. Remove and reset the existing granite curbing. The work will include approximately 170 LF of reset curbing and sidewalk. The Town of Wolfeboro will install a new catch basin, the Contractor will be required to reset the frame and grate to the appropriate finished grade once the curbing is removed and reset. Place 6” of NHDOT Crushed Gravel and 3” of NHDOT bituminous sidewalks. The new sidewalk widths shall match the existing widths. Any disturbance to the existing landscaping shall be returned to its original condition. The Contractor shall provide traffic control through the work zone at all times. The Contractor must maintain pedestrian access to the business at all times. Any existing striping that is disturbed due to the sidewalk/curbing installation will be re-painted by the Town of Wolfeboro.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents