Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Steeple View II - LCB Assisted Living
Demolition, New Construction, Infrastructure - 12,000 SF
Design
$3,200,000 CJ est. value
Newtown, PA 18940

Conshohocken Avenue Mixed-Use Residential Development
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Philadelphia, PA 19131

Rubberized Crack Seal
Term Contract, Infrastructure
Bidding
Quakertown, PA

Asphalt Resurfacing Between Milepost 345.73 and Milepost 353.49
Infrastructure
Post-Bid

Phase 1 High School/Middle School Parking Lots
Infrastructure, Alteration
Post-Bid
$1,400,000 to $1,650,000 est. value
Perkasie, PA 18944

Recreational Trail Extension
Results
$359,944 est. value
Perkasie, PA 18944

Tamanend Park Trail Improvements Phase 1
Results
Less than $500,000 est. value
Southampton, PA 18966

AutoZone #2071 / Perkasie
New Construction, Infrastructure - 7,147 SF
Construction
$1,900,000 CJ est. value
Perkasie, PA 18944

AutoZone #2071 / Perkasie
New Construction, Infrastructure - 7,147 SF
Construction
$1,900,000 CJ est. value
Perkasie, PA 18944

The Point
New Construction, Infrastructure, Renovation
Pending Verification
$7,000,000 CJ est. value
Morrisville, PA 19067

The Point
New Construction, Infrastructure, Renovation
Pending Verification
$7,000,000 CJ est. value
Morrisville, PA 19067

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Checkers Fast Food Restaurant - AARAV Investments LLC
New Construction, Infrastructure
Design
$900,000 CJ est. value
Croydon, PA 19021

Last Updated 02/16/2023 01:31 PM
Project Title

2022 Liquid Fuels Curb Ramp Construction Replacement Program

Physical Address View project details and contacts
City, State (County) Bristol, PA 19007   (Bucks County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $348,550 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves a base bid and fifteen alternate bids for the installation of ADA/PennDOT compliant curb ramps, with all necessary sidewalks, curbing, and sign relocation/ installation at specified locations within Bristol Township. All material, labor, and equipment necessary shall be in accordance with PennDOT Publication 408 and Township Standards. A nominal fee of 0.33% of the bid amount (up to $5,000) is assessed only to bidders who are awarded contracts. Each bid shall be submitted in accordance with Article 15 of Document 00 21 13 Instructions to Bidders and Document 00 21 13.1 Instructions Submitting Electronic Bids, including but not limited to a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to the Township of Bristol and proof of insurance in accordance with Paragraph 1.10 of Document 00 73 00 Supplementary Conditions. The successful Bidder shall be required to furnish performance bond for 100% of the amount of the contract, payment bond for 100% of the amount of the contract, and maintenance bond in such form as meets the approval of the Township of Bristol and having as security thereon such Surety company or companies as are approved by the Township of Bristol. This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act, as amended, and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry for work valued at over Twenty-Five Thousand Dollars ($25,000). The project is subject to applicable requirements of the Township's Responsible Contractor Ordinance for work valued at over Ten Thousand Dollars ($10,000). No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids. Bristol Township reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to waive any informality in the bids. CLARIFICATION DEADLINE 5/5/2022 5:00 PM

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents