Similar Projects
HMA Surface Removal
Post-Bid
Wood Dale, IL

Oak Brook Sports Core Improvements
Post-Bid
Less than $450,000 est. value
Oak Brook, IL

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

2021 Paving
Results
Clarendon Hills, IL

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

Alley Reconstruction - Section D
Post-Bid
Westmont, IL

2021 Street Resurfacing ST-004(B)
Results
Downers Grove, IL

2021 GM Road Resurfacing Program
Post-Bid
Naperville, IL

2021 Street Patching Program
Results
Naperville, IL

I-19-4449 I-294 Roadway and Bridge Widening and Rehabilitation
Post-Bid
Downers Grove, IL

2021 Road Program
Results
$910,439 est. value
Warrenville, IL

2021 Road Construction Season
Infrastructure
Post-Bid
Lisle, IL

2021 Street Resurfacing Program
Renovation
Results
Naperville, IL

Traffic Control, Pavement Striping, Tree Removal, HMA Paving
Term Contract
Post-Bid
Villa Park, IL

Last Updated 09/29/2022 10:08 AM
Project Title

Hawthorne Hill Woods, Phase 2 - Path Development

Physical Address View project details and contacts
City, State (County) Woodridge, IL 60517   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $582,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

** As of September 29, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The proposed work consists of furnishing all necessary labor (prevailing wage), materials, and equipment to complete development of the proposed bituminous asphalt path (ADA compliant), path and swale grading and earthwork. Offsite removal and legal disposal of designated trees, designated shrubs, and excess and/or unsuitable soils. Protection of existing wetlands and buffers, restoration of disturbed areas, native plant seeding, furnishing and installing live plant materials, and other items as listed on the project plans and specifications. The work shall include in the unit prices for each work activity any required excavations, backfill handling, stockpiling, and disposal. Project site, Hawthorn Hill Woods, located at 2929 71st Street in Woodridge, IL. All work as specified and in compliance with all applicable laws and codes. The contract documents including the Instructions to Bidders and plans and specifications and the Bid Package are on file beginning Thursday, June 23, 2022, and may be examined at the Administration Office of the Woodridge Park District, 2600 Center Drive, Woodridge, Illinois. These documents are also available upon request. Request for digital documents must be submitted at portal. Upon staff receipt of your company's requested information, all necessary bid documents will be emailed at no cost, within two business days. Information (other than in the form of a written Addendum issued by the Park District) from any officer, agent, or employee of the Park District or any other person shall not affect the risks or obligations assumed by the Bidder or relieve him from fulfilling any of the conditions and obligations set forth in the bid and/or other contract documents. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12).

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents