Similar Projects
Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 est. value
Placerville, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Contractor - CA FLAP ED CR 147(2) Ice House Road
Infrastructure
Bidding
$20,000,000 to $30,000,000 est. value
CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Place Polyester Concrete Overlay
Infrastructure
Post-Bid
$1,650,000 est. value
CA

Roadway Excavation Place Hot Mix Asphalt and Plastic Pipe
Infrastructure
Results
$870,000 est. value
CA

Hot Mix Asphalt (Hma) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
Placerville, CA

Ice House Road Pavement Rehabilitation - Phase 3 - 36105068 - El Dorado County
Infrastructure
Conception
$2,533,000 est. value
Kyburz, CA 95720

Asphalt Patch Paving
Term Contract
Post-Bid
Placerville, CA

Clean Culverts, Install Cured-in Place-Pipeliners and Invert Paving
Infrastructure
Results
$6,700,000 est. value
CA

Asphalt Patching Services
Infrastructure
Post-Bid
$500,000 est. value
South Lake Tahoe, CA

Roadway Excavation and Install Concrete Drainage Inlet
Infrastructure
Results
$850,000 est. value
CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

2022 Road Work Project
Infrastructure
Results
$250,000 est. value
CA

Reported 07/19/2022 01:44 PM
Project Title

Pioneer Trail And Bridge Street Extension - C1503 - Town Of Truckee

Physical Address View project details and contacts
City, State (County) Truckee, CA 96161   (El Dorado County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $35,580,133 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new access road linking Tahoe Donner to SR 89 north/SR 267 via an extension of Pioneer Trail as well as a connection to Downtown Truckee via a Bridge Street extension using the Trout Creek I-80 underpass. As of July 18, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents