Similar Projects
Twin Sludge Force Main Rehabilitation
Infrastructure
Bidding
$13,000,000 to $14,000,000 est. value
Mamaroneck, New Rochelle, NY 10801

Village-Wide Sanitary Sewer Smoke Testing
Infrastructure
Bidding
Pelham, NY

Various Manhole Frame and Covers Replacement
Post-Bid
Rye Brook, NY 10573

Sanitary Sewer Enhancements Phase 1D
Post-Bid
New Rochelle, NY 10801

Catch Basin Tops and Grate Risers
Results
South Salem, NY 10590

Suffolk Trail Sanitary Sewer
Results
Yonkers, NY 10701

Village-Wide CCTV Sanitary Sewer Inspection
Infrastructure
Bidding
Pelham, NY

Manhole Covers and Frames
Post-Bid
White Plains, NY 10601

Continental Street Sanitary Sewer Improvements
Results
Sleepy Hollow, NY 10591

Sanitary Sewer Rehabilitation
Post-Bid
Mamaroneck, NY 10543

Cleaning, Televising, Cured In Place Pipelining and Other Rehabilitation Work for Storm and Sanitary Sewer Lines
Term Contract
Results
Scarsdale, NY 10583

Televising and Cleaning of Sewer and Drain Appurtenances
Term Contract
Post-Bid
New Rochelle, NY

Cortlandt Street Drainage and Sanitary Sewer Main Improvement
Results
Sleepy Hollow, NY 10591

Cleaning, Televising, Manhole Rehabilitation - Inspection, Cured In Place Pipelining
Term Contract
Post-Bid
Rye Brook, NY

Internal Inspection of Various Trunk Sewer at Bronx Valley and Hutchinson Sewer District
Results
Mount Vernon, Yonkers, NY

Last Updated 09/02/2021 11:18 AM
Project Title

Hutchinson Valley Trunk Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Eastchester, NY   (Westchester County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $850,000 to $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract consists of providing all necessary labor, material and equipment required to rehabilitate the Hutchinson Valley Trunk Sewer including but not limited to bypassing of sanitary flows around the work area excavation; jack and bore a 30-inch steel pipe casing under exit 18W on the Hutchinson Parkway South; installation of a 16-inch DIP gravity sewer within the pipe casing; and trenching in the Exit 18W median to connect to the existing manhole.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts