Similar Projects
Filament East
New Construction - 4,886 SF
Design
$68,000,000 est. value
Bellevue, WA 98004

ASOG Complex Camp Murray
New Construction, Infrastructure - 56,000 SF
Design
$25,000,000 CJ est. value
Fort Lewis, WA 98433

Premera Blue Cross
New Construction, Infrastructure - 60,000 SF
Pending Verification
$12,000,000 CJ est. value
Spokane, WA 99201

Anytime Fitness
Build-Out - 5,339 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Kennewick, WA 99337

RFQ - Multi-use Recreational Properties Master Plan
Term Contract
Post-Bid
$190,000 CJ est. value
Mill Creek, WA 98012

Linc Lofts Apartments
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Spokane, WA 99201

4th Avenue Apartment Building With Hotel And Retail
New Construction, Infrastructure - 200,000 SF
Conception
Seattle, WA 98121

Northwest Market Street Apartments Building
New Construction - 2,264 SF
Design
Seattle, WA 98107

Central Washington University Nicholson Pavilion
Renovation, Addition
Design
Ellensburg, WA 98926

Esplanade at Northpointe
Renovation, Addition - 115,000 SF
Conception
$2,000,000 est. value
Spokane, WA 99218

Assisted-Living and Memory Care Facility
New Construction - 122,400 SF
Design
$25,000,000 est. value
Spokane, WA 99223

Pure Barre
Build-Out - 1,880 SF
Post-Bid
Lynnwood, WA 98036

Northern Fruit Campus
New Construction, Infrastructure
Pending Verification
$201,300,000 CJ est. value
East Wenatchee, WA 98802

Office Building
New Construction - 143,000 SF
Design
$10,000,000 CJ est. value
Issaquah, WA

Ion
New Construction, Infrastructure
Pending Verification
$85,500,000 CJ est. value
Shoreline, WA 98155

Last Updated 08/24/2022 05:31 AM
Project Title

Upgrade Bowling Alley Rainier School

Physical Address View project details and contacts
City, State (County) Buckley, WA 98321   (Pierce County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $87,560 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the RFQ is to repair and restore the string pinsetters at Rainier State School. The company that is awarded the bid must be highly skilled and familiar with bowling alleys and their unique requirements to ensure preservation of the current asset. Question Deadline 08/16/2022 at 2:00 PM Bidder Written Questions must be submitted no later than

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents