Similar Projects
Gaoa Big Hole Recreation Site Renovations, Montana
Term Contract
Design
$500,000 to $1,000,000 est. value
Butte, MT 59707

Cold Milling, PMS Overlay, Seal and Cover, Guardrail, and Pavement Markings on the Fishtrap East and West
Infrastructure
Post-Bid
MT

Lincoln Road Overlay and Chip Seal
Infrastructure
Post-Bid
$400,000 CJ est. value
Helena, MT 59601

Scrub Seal Hwy 10 E Se of Greycliff Interchange Billings Area
Infrastructure
Results

Scrub Seal Hwy 10 E Se of Greycliff Interchange Billings Area
Infrastructure
Results

Meadowlark Senior Apartments
New Construction, Infrastructure
Pending Verification
$9,500,000 CJ est. value
Butte, MT 59701

Smelter City Recreation Complex
New Construction, Infrastructure
Pending Verification
$23,770,000 CJ est. value
Anaconda, MT 59711

Overlay, Chip Seal, Guardrail Centennial Ave and Excelsior St Butte Area
Infrastructure
Post-Bid
Butte, MT

Airport Improvements Bert Mooney Airport
Infrastructure
Results
$2,344,721 est. value
Butte, MT 59707

Blacktail Creek Subdivision
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Butte, MT 59701

Seal and Cover, Signing, Pavement Markings on the Butte- Urban
Infrastructure
Post-Bid
Butte, MT

Jackson Creek Road Improvements
Term Contract
Results

Beehive Assisted Living Facility
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Butte, MT 59701

ADLC Daly Addition Road Improvements Project
Alteration
Post-Bid
Anaconda, MT

2022 Mill/Fill Project
Infrastructure
Results
$300,000 est. value
Butte, MT

Last Updated 06/12/2023 03:36 AM
Project Title

Overlay and Chip Seal Bossard Road SE of Gregson Interchange Butte Area

Physical Address View project details and contacts
City, State (County) Anaconda, MT 59711   (Deer Lodge County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2022
Bids Due View project details and contacts
Estimated Value $479,860 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 29 the project is awarded to Jim Gilman Excavating Inc for $479,860.30. The Montana Department of Transportation (MDT) is requesting bids for Overlay and Chip Seal Bossard Road SE of Gregson Interchange Butte Area. Questions or information relating to either specifications or requirements of this solicitation must be asked through the eMACS Q&A Board. Potential bidders must log into eMACS to submit a question on the Q&A Board. Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 3,157 tons of 3/4 " Commercial Plant Mix Grade S 64-28 asphalt mix material. The overlay shall be paved 015 feet thick and approximately 22 feet wide. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 31,812 square yards of laid-in-place chip seal. The chip seal will be approximately 2.41 miles long and 22 feet wide. Contractor shall provide CHFRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. The emulsion application rate for chip seals is estimated at .44 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. The Contractor will provideinterim and final striping. Contractor is responsible for test trailer, transport, and setup. If the Department decides to perform testing at an area lab, this bid item will be deleted from the contract. The quantity is estimated and will bechanged accordingly depending on pickup and delivery locations and miles transported. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above WORK IS REQUIRED TO BE COMPLETED ON OR BEFORE: AUGUST 31, 2022

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Aggregate Surfacing, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents