Similar Projects
Last Updated | 06/12/2023 03:36 AM |
Project Title | Overlay and Chip Seal Bossard Road SE of Gregson Interchange Butte Area |
Physical Address | View project details and contacts |
City, State (County) | Anaconda, MT 59711 (Deer Lodge County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2022 |
Bids Due | View project details and contacts |
Estimated Value | $479,860 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 29 the project is awarded to Jim Gilman Excavating Inc for $479,860.30. The Montana Department of Transportation (MDT) is requesting bids for Overlay and Chip Seal Bossard Road SE of Gregson Interchange Butte Area. Questions or information relating to either specifications or requirements of this solicitation must be asked through the eMACS Q&A Board. Potential bidders must log into eMACS to submit a question on the Q&A Board. Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 3,157 tons of 3/4 " Commercial Plant Mix Grade S 64-28 asphalt mix material. The overlay shall be paved 015 feet thick and approximately 22 feet wide. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 31,812 square yards of laid-in-place chip seal. The chip seal will be approximately 2.41 miles long and 22 feet wide. Contractor shall provide CHFRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. The emulsion application rate for chip seals is estimated at .44 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. The Contractor will provideinterim and final striping. Contractor is responsible for test trailer, transport, and setup. If the Department decides to perform testing at an area lab, this bid item will be deleted from the contract. The quantity is estimated and will bechanged accordingly depending on pickup and delivery locations and miles transported. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above WORK IS REQUIRED TO BE COMPLETED ON OR BEFORE: AUGUST 31, 2022 |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |