Similar Projects
Heddington Oaks Drainage Improvements
Infrastructure
Bidding
$200,000 est. value
Peoria, IL

Construction of the Main Street Sidewalk Improvements
Infrastructure
Bidding
$2,000,000 est. value
Princeville, IL 61559

ADA Sidewalk
Post-Bid
Chillicothe, IL

2021 North Valley Sidewalk Improvements
Alteration
Post-Bid
Peoria, IL

GPSD Sewer Rehabilitation; Erosion Control, Project 2
Results
Less than $1,400,000 est. value
Peoria, IL 61600

Illini Bluffs Saylor Street Parking Lot Phase 1
Results
Less than $211,770 est. value
Glasford, IL 61533

PPS Harrison Community Learning Center Sidewalk Improvements
Infrastructure
Bidding
$200,000 est. value
Peoria, IL 61605

Second Street ADA Sidewalk
Infrastructure
Post-Bid
Chillicothe, IL 61523

Accessible Parking and Path Improvements
Results
Peoria, IL 61604

Nebraska Corridor Upgrade
Infrastructure
Post-Bid
Peoria, IL

Repair Privately-Owned Vehicle Parking Lot
Results
Less than $1,500,000 est. value
Bartonville, IL 61607

Sidewalk Participation Program 2021
Infrastructure
Post-Bid
Peoria, IL

Construction of Rock Island Trail Extension
Results
Peoria, IL 61603

Corrugated Structural
Infrastructure
Post-Bid
Peoria, IL

Warehouse Parking Lot Resurfacing
Results
$104,613 est. value
Peoria, IL

Last Updated 06/23/2022 11:58 AM
Project Title

Stadium and North Parking Lot Drainage Improvements

Physical Address View project details and contacts
City, State (County) Peoria, IL   (Peoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project work shall include, but not limited to, removal of existing storm sewer, headwall removal and replacement, dry-wells, storm sewer piping, french drain, retaining wall, earthwork, and miscellaneous site restoration. Completion dates for this project vary – Alternate Bid #1 & #2: June 10th, 2022, and Alternate Bid #3: July 15th, 2022. Commencement of the work on the project may begin as early as May 23rd, 2022 for Alternate Bid #1 & #2 and May 27th, 2022 for Alternate Bid #3. Any work before this date shall be subject to the discretion of Pekin Community High School.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents