Similar Projects
WC-1416 East Madison Street and Vicinity Water Main Replacement - 557-243 - City of Baltimore
Infrastructure
Conception
$4,210,000 CJ est. value
Baltimore, MD 21205

Londonderry Court - City of Laurel
Infrastructure
Conception
$250,000 est. value
Laurel, MD 20707

Primrose School / Annapolis
New Construction, Infrastructure - 12,405 SF
Design
$3,000,000 CJ est. value
Annapolis, MD 21403

Defense Logistics Agency (Dla) Site Improvements, Fort Meade, Md
Renovation
Design
$10,000,000 to $25,000,000 est. value
Fort Meade, MD 20755

AutoZone #6782 / Odenton
New Construction, Infrastructure - 6,446 SF
Post-Bid
$250,000 CJ est. value
Odenton, MD 21113

AutoZone #6782 / Odenton
New Construction, Infrastructure - 6,446 SF
Post-Bid
$250,000 CJ est. value
Odenton, MD 21113

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Resurface Parking Lot at Annapolis Readiness Center
Infrastructure
Results
Less than $100,000 est. value
Annapolis, MD 21401

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

Park Place Hotel
New Construction, Infrastructure - 76,985 SF
Pending Verification
$33,000,000 CJ est. value
Annapolis, MD 21401

Park Place Hotel
New Construction, Infrastructure - 76,985 SF
Pending Verification
$33,000,000 CJ est. value
Annapolis, MD 21401

Van Dusen Road Phase 1 - Killbarron Drive to Contee Road - city of Laurel
Infrastructure
Conception
$831,000 est. value
Laurel, MD 20723

Mount Vernon District Eager Street Mixed Use Building
New Construction, Alteration
Design
$35,000,000 est. value
Baltimore, MD 21201

East Campus Building 5 (ECB5) Pre-Construction / Construction Services
New Construction
Post-Bid
Less than $500,000,000 est. value
Fort George Meade, MD 20755

Last Updated 07/06/2023 03:05 PM
Project Title

RFP D/B - East Campus Building 4 (ECB4) at Fort George G. Meade

Physical Address View project details and contacts
City, State (County) Odenton, MD 21113   (Anne Arundel County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Maintenance, Military Facility, Parking Garage, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $697,844,325 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*Given the confidentiality of this project, status updates will not be available including construction timeline. The U.S. Army Corps of Engineers (USACE), Baltimore District (NAB), East Campus Integrated Program Office (ECIPO) issues this pre-solicitation notice for a fixed price award fee (FPAF) design-build (DB) construction contract. This proposed procurement is Full and Open Competition (Unrestricted); NAICS 236220 "Commercial and Institutional Building Construction" with a size standard of $39,500,000.00. Project Description: The project consists of constructing a new State-of-the-Art operations facility at approximately 858,000 gross square feet (GSF) in size including supporting facilities with associated site work and environmental measures. The facility will be built on Fort George G. Meade, Maryland. The primary facility will be comprised of a multi-story structure with full basement. The facility includes open office areas, operations areas, collaboration spaces, food market, fitness center and remote learning/unclassified VTC areas. The mission support areas provide joint staff offices, executive offices, machine rooms, storage, and meeting rooms. The project consists of core and shell structure and foundation; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm and suppression; information technology infrastructure, communications, and security support infrastructure; exterior finishes and weatherproofing. Interior build out will provide raised access floor systems, acoustically-rated interior partitions and ceilings, power, lighting, environmental control and communications. The primary facility is not a standard design. The majority of the structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. Project includes redundant primary power and Uninterruptable Power Supply (UPS) systems to ensure continuity of operations. This project requires comprehensive interior design. Site infrastructure will include primary electrical service to the site, water, sewer, and telecommunications pathways. The supporting facilities include, site preparation and telecommunication improvements, utility services, perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards and roads. Perimeter security reconstruction and extension is required with road improvements. The project also includes a multi-level modular parking structure to support approximately 3,240 parking spaces with future expansion capability, pedestrian bridges connecting the adjoining East Campus User buildings and the parking structure and preparations for future bridge connection to potential future adjoining buildings. The magnitude of construction is over $500,000,000.00. Construction duration is approximately 1016 calendar days from notice to proceed (NTP). Additional information in accordance with the statement of work will be included in the request for proposal (RFP) package. This will be a Two Phase Design-Build contract utilizing the best value tradeoff process. An award will be made to the offeror whose proposal is determined to be the best value to the Government considering the evaluation factors. It is anticipated that Phase I will be released on or about September 18, 2020 with proposals due on or about November 2, 2020. Phase I of the solicitation will be provided in an electronic format, free of charge, to all authenticated account holders of beta.SAM. To familiarize vendors with the system, please download the Vendor guide by logging into https://www.beta.sam.gov. The media through which the Government chooses to issue this solicitation will be the Internet only. This solicitation will not be issued in paper. Interested PRIME CONTRACTORS are required to fill out a Statement of Affiliation (SOA) that will be issued with the Phase I solicitation. This document will be reviewed and approved by the security personnel; however submitted through USACE. A foreign interest is defined as any of the following: A foreign government or foreign government agency; Any form of business enterprise or legal entity organized, chartered or incorporated under the laws of any country other than the United States or its possessions; Any individual who is not a U.S. citizen; or Any form of business enterprise organized or incorporated under the laws of the U.S., or a State or other jurisdiction within the U.S. that is owned, controlled, or influenced by one of the entities described in 1, 2, or 3 above. If the interested contractor should possess any of the above they will be required to submit a statement/letter of mitigation in order to explain their foreign interest for further review and approval. SOAs shall be submitted for approval no later than one week from the date the Phase I solicitation is issued to ensure approved SOAs can be included in the final Phase I proposal. Interested contractors shall anticipate up to a two week Government review/process of SOAs. While not required, interested Prime Contractors may submit SOAs for approval prior to the issuance of the Phase I solicitation to Sierra Marshall, Contract Specialist at email: Sierra.s.marshall@usace.army.mil. The SOA form can be found as an attachment to this notice. Phase II of the solicitation will only be available to those offerors selected to advance to Phase II. It is anticipated that Phase II will be released on or about April 29, 2021 with proposals due on or about July 29, 2021 and award on or about January 24, 2022 Vendors must be registered with the System for Award Management (SAM) database to receive a government contract award. Vendors must also be registered in Representations and Certifications Applications (included in SAM). The North American Industry Classification System (NAICS) Code applicable (236220 listed above) to this acquisition must be in vendor's SAM registration. Note: Update SAM profile to include all applicable NAICS Codes associated with your company. Vendors may register for SAM online at www.sam.gov or by calling 1-866-606-8220

Details

864,000 SF. Parking Spaces, 3240 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents