Similar Projects
Construction Services for the Sidewalk Safety Improvement Program
Term Contract
Bidding
$3,470,725 est. value
FL

Lehigh Trailhead
Infrastructure
Bidding
$2,268,215 est. value
Palm Coast, FL

I-75 MLK DDI
Post-Bid
FL

Douglas Bldg. ADA Upgrades- Parking
Post-Bid
Tallahassee, FL 32399

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Results
Less than $1,158,847 est. value
Jacksonville, FL 32099

Parking Lot Resealing at Trails and Tails Park and Veterans Park
Results
Less than $22,000 est. value
Doral, FL 33178

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

AASF 1 POV Parking Resurface and Restripe
Infrastructure
Bidding
$300,000 to $350,000 est. value
Jacksonville, FL 32221

Nease High School Parking Lot Repairs
Post-Bid
Ponte Vedra, FL 32081

4th Avenue Sidewalk - JSEB Set-Aside
Results
Jacksonville, FL 32202

Reseal and Restripe Services (CO-Op)
Infrastructure
Bidding
Clearwater, FL

VCA Improvements to Common Areas & Parking Spaces
Post-Bid
Hialeah, FL 33014

Thunderbird East and Thunderbird West Sidewalk Extensions
Results
Sebring, FL 33870

Dr. Khada Medical Office - Site Work
Renovation
Bidding
$1,000,000 to $5,000,000 CJ est. value
Clermont, FL 34711

CEMIRT Construct New Parking Lot F/ Heavy Vehicles
Post-Bid
Panama City, FL 32403

Last Updated 09/02/2021 04:34 PM
Project Title

Cross Seminole Trail Phases I and II

Physical Address View project details and contacts
City, State (County) Longwood, FL 32750   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,102,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Undertaking bicycle and pedestrian improvements starting at the intersection of CR 427 (Ronald Reagan Boulevard) and E. Church Avenue. Sidewalk and trail improvements are planned along E. Church Avenue, eastward to N. Grant Street, and then the project will follow N. Grant Street northward to approximately 150 feet north of the intersection of Grant Street and Quail Avenue. From this point the project will turn east and follow undeveloped right-of-way to Timocuan Way. The remainder of the project will follow Timocuan Way to the north and connect to the existing section of the Cross Seminole Trail on the south side of General Hutchinson Parkway. There will be bicycle share lane markings (Sharrows) placed from CR 427 along Church Ave and N. Grant St. all the way to the terminus at the Cross Seminole Trail except for the portion of proposed shared use trail from Candyland Park to the North end of N. Grant St.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents