Similar Projects
Overhaul Archimedes Screw Pumps FC440
Alteration
Bidding
$500,000 to $1,000,000 est. value
Camp Lejeune, NC

Black Creek Well 6 - Pump and Well Rehabilitation Project
Infrastructure
Bidding
Richlands, NC 28574

Replace Pumps and Controls B3881
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC 28533

Three Phase Pump for Commons P.S.
Post-Bid
Jacksonville, NC

Contract III - 2020 USDA Well Building Improvements
Results
Red Springs, NC 28377

Construction of 2 New Water Supply Wells Serving
Results
Less than $392,000 est. value
Wallace, NC 28466

Water Well Drill
Post-Bid
Willow Spring, NC 27592

Pendergrass Chlorine Booster Pump System
Results
Sanford, NC 27330

Vacuum Turbo Pump
Post-Bid
Raleigh, NC

Repair, Overhaul, and Rebuild of Stokes Mechanical Pump
Results
Cherry Point, NC

Tsurumi Pumps Submersible
Post-Bid
Wilmington, NC

Well 46 And 47 Improvements
Results
$1,192,000 to $1,196,000 est. value
Wilmington, NC

Annual Standby Emergency Pumping Contract
Term Contract
Post-Bid
Pine Knoll Shores, NC

Skid Pump Package
Results
Boone, NC

Hymax Grip Elbow
Term Contract
Post-Bid
Jacksonville, NC

Reported 03/11/2022 12:00 AM
Project Title

Well No. 6 Site Improvements and Raw Water Main

Physical Address View project details and contacts
City, State (County) Newport, NC 28570   (Carteret County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: • Approximately 3,550 LF of new 8-inch raw water main. Portions of the main are by open cut and portions of it are by Horizontal Directional Drilling (HDD). Refer to the plans and the bid form for details. • A connection of the new raw water main to the existing plant piping as shown on the plans. • Additional site clearing and grading at the well site as shown on the plans. • New well enclosure as shown and specified. • Well head piping, valves, fittings and accessories. • New well controls and equipment rack as required to place the well into operation. • Erosion and Sedimentation control. • New site fencing at the well site as shown. • Well head piping testing and chlorination, and electrical load testing. • Provision of power other than that provided by the utility owner. • If ADD Alternate #1 is accepted, provision of a standby power generator • Automatic transfer switch is included whether the add alternate is accepted or not. • System Control and Data Acquisition (SCADA) as specified.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents