Similar Projects
Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Road Work
Post-Bid
Verona, WI

Madison - Cambridge, Whitney Way to IH 39/90
Results
Cambridge, Madison, WI 53558

Road Repairs
Post-Bid
WI 53572

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

2021 Road Paving
Post-Bid
McFarland, WI

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

2021 Sealcoating
Renovation
Post-Bid
McFarland, WI

Winnequah Road Bridge Replacement
Results
Monona, WI

Chip Seal Surfacing and Crack Filling of Town Roads
Post-Bid
Roxbury, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Road Sealcoating
Post-Bid
Marshall, WI

Last Updated 03/24/2022 11:20 AM
Project Title

CTH M/CTH PB Intersection Expansion Project

Physical Address View project details and contacts
City, State (County) WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major work consists of the following items: Approximately 3,100 square yards of removing asphaltic surface, 3,800 square yards of removing asphaltic surface milling, 5,150 cubic yards of common excavation, 500 cubic yards of borrow, 7,100 tons of base aggregate dense, 8 stations of shaping shoulders, 490 square yards of Concrete Pavement 9-Inch, 90 square yards of concrete truck apron 12-inch, 30 cubic yards of coloring concrete WisDOT red, 1,250 tons of HMA pavement 3 MT 58 28 S, 1,450 tons of HMA pavement 4 MT 58-28 S, 1,585 linear feet of concrete curb and gutter, 1,280 square feet of concrete sidewalk 5-inch, 4,100 linear feet of sawing pavement, 11,755 linear feet of marking line epoxy, 40 linear feet of culvert extensions, 16 linear feet of hydrant lead, 1 relocated hydrant, temporary traffic signals at the intersection of CTH M & CTH PB, traffic signals at the intersection of CTH PB & USH 18/151 eastbound ramps, traffic signals at the intersection of CTH M & CTH PB, and all appurtenant work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents