Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Heating, Ventilation, and Air Conditioning (HVAC) Services
Term Contract
Sub-Bidding
Arlington Heights, IL 60004

RPZ and HVAC UPGRADES at Clearbrook's facility
Renovation
Sub-Bidding
$205,000 CJ est. value
Arlington Heights, IL 60005

Replace Building 215 DDC Hines It Center (HITC)
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Hines, IL 60141

Roof Top Unit Replacement
Alteration
Post-Bid
Arlington Heights, IL

D107 Pleasantdale ES Roofing and HVAC
Alteration
Results
La Grange, IL 60525

HVAC Scheduled Inspections, Service, Maintenance and Authorized Repairs
Term Contract
Results
Arlington Heights, Bridgeview, Des Plaines, East Dundee, Elgin, Elk Grove Village, Evanston, Harvey, Hoffman Estates, Joliet, Markham, McHenry, Melrose Park, North Aurora, Plainfield, South Holland, Waukegan, IL 60050

Village Hall Chiller and Cooling Tower Replacement
Renovation
Sub-Bidding
$855,000 CJ est. value
Hoffman Estates, IL 60169

Selective HVAC Replacement District Schools
Alteration
Post-Bid
$300,000 est. value
Calumet City, IL

West Dome RTU Replacement
Alteration
Results
River Grove, IL 60171

Carrier HVAC Maintenance Plan
Term Contract
Sub-Bidding
Lemont, IL 60439

Moraine Valley Community College Building T Chilled Water Upgrades Phase 1
Alteration
Post-Bid
$2,140,669 est. value
Palos Hills, IL 60465

HVAC Upgrades to Macarthur School
Alteration
Results
South Holland, IL 60473

Reavis High School - Bid Package 23A - HVAC
Alteration
Post-Bid
$217,000 est. value
Burbank, IL 60459

Last Updated 09/18/2023 09:21 AM
Project Title

Jesse Owens Elementary Community Academy - RTU Replacement

Physical Address View project details and contacts
City, State (County) Chicago, IL 60628   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of the bid. Scope of Work Replace RTU # 2 air conditioning unit and controls Provide crane for installation and removal of existing RTU Provide disposal of existing RTU # 2 Provide controls to operate RTU # 2 and any wiring to control or operate equipment Install insulated pipe wrapping and conduit straps on all piping Install new piping as needed Replace or repair damaged roof due to the replacement project Provide evaporator coil, controls, solenoids, refrigerant, and all associated parts Provide any building permit Provide test and operation of replacement (Factory start-up) Provide 4hrs training on equipment for a building engineer ONLY PREQUALIFIED POOL Various Trades Questions Due Date: Aug 14th 2023, 1:30 PM CDT

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents