Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Paving, Curb, Gutter and Sidewalk, Guardrail and Pavement Markings on Northwestern Service Drive
Infrastructure
Bidding
$2,086,000 est. value
Southfield, MI 48034

Hot Mix Asphalt Ultra-thin Overlay, Aggregate Shoulders and Pavement Markings on Hillcrest Road
Infrastructure
Bidding
$319,000 est. value
Northville, MI 48167

Central Division - Asphalt Paving Maintenance
Post-Bid

Paving & Site Lighting
Post-Bid

0.63 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Water Main, Drainage, Concrete Curb, Gutter and Ramps, Signing and Pavement Markings on Saginaw Street from Airport Drive to Oakwood Street
Results
MI

Huron Valley Trail Resurfacing Project
Results
Less than $404,270 est. value
New Hudson, MI 48165

Hot Mix Asphalt Cold Milling and Resurfacing, Aggregate Shoulders, Guardrail, Signing and Pavement Markings on Groveland Road
Infrastructure
Bidding
$945,000 est. value
MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Pavement Restorations
Results
Waterford, MI 48328

Mann Road - Floretta Street to Clintonville Road
Infrastructure
Bidding
$200,000 est. value
Beverly Hills, MI

FPE Cip Paving 2021
Infrastructure
Post-Bid
Waterford Township, MI 48328

2021 Paving Program
Results
Troy, MI 48098

Hot Mix Asphalt Cold Milling and Resurfacing, Aggregate Shoulder and Pavement Markings on Rochester Road
Infrastructure
Bidding
$4,015,000 est. value
Rochester, MI

Road Repair - Hma Thermal Bond
Infrastructure
Post-Bid
MI

Last Updated 05/17/2022 05:21 AM
Project Title

Tanglewood Golf Community Street Resurfacing Project

Physical Address View project details and contacts
City, State (County) New Hudson, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Cold-milling and placement of a bituminous overlay on 15 residential streets within the Tanglewood Golf Community. The work includes approximately 14,000 tons of cold-milling bituminous pavement; about 8,100 tons of MDOT 5E1 and 1,150 tons of MDOT 3E1 HMA pavement; about 4,800 tons of MDOT 3E1 to be used as a patching mixture; 6,100 lineal feet of concrete curb and gutter removal and replacement; repairing concrete block storm sewer manholes and inlet structures; maintaining traffic; and all other necessary and related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents