Similar Projects
Water, Sanitary Sewer, Drainage Facilities and Paving and Appurtenances to Serve Ervin Road Phase 1 and Sanitary Sewer Truck System to Serve Samara Phase 1
Infrastructure
Bidding
TX

Black and Galvanized Pipe Fittings
Post-Bid
Corpus Christi, TX 78401

Bryson Phase 2, Section 3, Public Improvement Construction Plans Water, Wastewater, Drainage and Paving Improvements
Post-Bid
Leander, TX 78641

Waterline Improvements at Forest View Development
Results
$72,200 est. value
Mineola, TX 75773

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Lively Tract - Phase 3 - Water, Wastewater, and Drainage Improvements
Post-Bid
TX

Transmission Line Construction and Maintenance Services
Results
Less than $95,000,000 est. value
Austin, TX 78703

Bryson Phase 11 Public Improvement Construction Plans Project 19
Post-Bid
Leonard, TX

2018 CIP Year 2 Contract 17
Results
$6,500,000 est. value
Fort Worth, TX 76102

Crescent Bluff Section 4
Infrastructure
Post-Bid
TX

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Lakes at Creekside Section 9
Results
Houston, TX

Replat of Lots 3 and 4 Block A Siena South, Section 1 - Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Infrastructure
Post-Bid
TX

Water, Sewer and Drainage Improvements for Veranda Section 33
Results
TX

USDA Abilene Water Supply - Waterline Section 1 & 4 - Contract 2
Results
$1,750,000 est. value
Buffalo Gap, TX

Water, Wastewater, Street and Drainage Improvements
Results
Austin, TX 78628

Last Updated 11/18/2021 06:00 AM
Project Title

Phase 1B Treated Pipeline Segment B

Physical Address View project details and contacts
City, State (County) TX   (Caldwell County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000,000 to $50,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of approximately 55,340 LF of 42-inch water and 28,550 LF of 36-inch water pipelines and associated appurtenances and connections. The pipelines are primarily constructed via open-cut methodology but feature trenchless/tunneled crossings of major creeks and roadways/highways, including a 775 LF tunneled crossing of State Highway 130.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents