Similar Projects
2022 Capital Improvements - Jamestown Public Schools District
New Construction, Renovation, Infrastructure
Design
$86,500,000 CJ est. value
Jamestown, NY 14701

I-86 / Chautauqua Lake; Bridge Rehab
Infrastructure
Design
$49,000,000 CJ est. value
Stow, NY 14710

Ball Creek Streambank Stabilization - Water Quality Improvement Project (WQIP)
New Construction, Infrastructure
Bidding
$50,000 CJ est. value
Ashville, NY 14710

Ball Creek Streambank Stabilization - Water Quality Improvement Project (WQIP)
New Construction, Infrastructure
Bidding
$50,000 CJ est. value
Ashville, NY 14710

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Fredonia CSD Capital Outlay Project 21/22
Infrastructure, Alteration
Results
Fredonia, NY 14063

Highway Job Order Contract
Infrastructure
Results
$600,000 est. value

Jamestown Public Schools Capital Project Phase 1 at Fletcher Elementary, Technical Academy and Bus Garage - BP-01 Site Work
Infrastructure
Construction
$300,000 CJ est. value
Jamestown, NY 14701

Brooks TLC Microhospital
New Construction, Infrastructure - 93,517 SF
Pending Verification
$74,000,000 CJ est. value
Fredonia, NY 14063

Brooks TLC Microhospital
New Construction, Infrastructure - 93,517 SF
Pending Verification
$74,000,000 CJ est. value
Fredonia, NY 14063

Replacement of Sidewalks at Various Locations
Infrastructure
Bidding
$200,000 CJ est. value
Bemus Point, NY 14712

Regional Drainage and Culvert Cleaning (Statewide)
Term Contract, Infrastructure
Post-Bid

Concrete Work: Street Reconstruction 2022 - Terrace Place
Infrastructure
Results
Jamestown, NY 14701

South Ripley Solar and Storage
New Construction, Infrastructure
Pending Verification
$348,000,000 CJ est. value
Ripley, NY 14775

Last Updated 06/30/2023 05:03 PM
Project Title

Grandview Stormwater Management Project

Physical Address View project details and contacts
City, State (County) Lakewood, NY 14750   (Chautauqua County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $248,400 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Lakewood Invites Submission of Sealed Bids for Construction of a Project as Follows: Construction of a Stormwater Project - Including Site Clearing/grubbing, Access Trails, Engineered Wetlands, Swales, Plantings, Ecological Features, and Other Related Work as Shown in the Bid Plans on a Wooded Property Owned by the Village. Bids Shall Include Costs for Base Bid and Three Additive Items as Shown in Bidding Documents. Each Bid Must Be Accompanied by a Bid Bond or Certified Check in the Amount of Ten Percent (10%) of the Amount of the Bid, Duly Executed by the Bidder as Principal, and Having as Surety Thereon a Surety Company Approved by the Owner. A Performance Bond Equal to 100% of the Contract Sum is Required to Be Delivered at Time Contract is Signed With Owner. All Qualified Bidders, Including Minority and Women-owned Business Enterprises (Mwbe), Are Encouraged to Respond. Funding for This Project is Being Provided by the New York State Department of Environmental Conservation. The Selected Contractor Must Comply With All Provisions in the Contract Between the Nysdec and the Village, Including the Mwbe Goals. The Overall Mwbe Participation Goal for This Project is 30%. Respondents Are Expected to Demonstrate How They Will Achieve This Goal. No Bidder May Withdraw Their Bid Within Forty-five (45) Days of the Date of the Bid Opening. The Village Reserves the Right to Waive Any Inconsistencies and to Reject Any or All Bids. The project is expected to start upon execution of the contract between the Village and Contractor and should be completed no later than December 31, 2023 barring extreme inclement weather conditions or acts of God as explained below. Contractor should plan for a small amount of touchup work in the spring of 2024 to address any minor settling or erosion areas and touch-up newly planted vegetation areas to ensure 90% survival.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents