Similar Projects
Wastewater Treatment Facility System Improvements
Renovation
Bidding
$9,000,000 est. value
Albia, IA

WTP Replacement Backwash Air Blower
Renovation
Bidding
$165,000 est. value
Boone, IA

2020 Municipal Water Filtration Improvement
Renovation
Post-Bid
Somers, IA

Wastewater Treatment Facility Improvement
Addition
Post-Bid
$210,000 est. value
Dubuque, IA 52003

City of Center Point WWTP
New Construction
Results
$7,600,000 est. value
Center Point, IA

Water Treatment Improvements
Renovation
Results
$1,043,998 est. value
Dunkerton, IA

Storage of Lime Sludge
Term Contract
Post-Bid
Cedar Rapids, IA

J Avenue Water Treatment Plant Ammonia Storage System Improvements
New Construction
Results
$790,000 est. value
Cedar Rapids, IA 52402

Wastewater Treatment Facility Improvements
Renovation
Post-Bid
$210,000 est. value
Dubuque, IA 52003

NW Water Treatment Plant - Softening Basin Addition
Addition
Results
$15,790,000 est. value
Cedar Rapids, IA

Hiawatha Boyson Road WTP Backwash Tank 2021
New Construction
Post-Bid
$280,000 est. value
Hiawatha, IA 52233

Pressure Filter No. 1 Repairs
Renovation
Results
Less than $158,400 est. value
Harlan, IA 51537

2021 AMU Water Filter Rehabilitation
Renovation
Results
Less than $684,000 est. value
Atlantic, IA

Water Treatment Plant Improvements
New Construction
Results
Shelby, IA

Nevada Wastewater Treatment Facility - Phase 3
New Construction, Renovation
Results
Less than $6,180,000 est. value
Nevada, IA

Last Updated 03/16/2022 03:07 PM
Project Title

J Avenue Water Treatment Plant Storage Bin Cleaning

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA 52402   (Linn County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for cleaning two (2) plugged concrete quicklime storage bins at the location listed below. The bins need to be cleaned out so the roof can be replaced to stop further leaking and contamination of the quicklime stored within them.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents