Similar Projects
Railroad Avenue – CDBG 2016 – Water and Sewer System Improvements
Post-Bid
Cochran, GA

Magnolia Drainage Improvements
Post-Bid
Less than $275,000 est. value
Tifton, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Storm Drainage Improvements FY2018 CDBG
Post-Bid
Irwinton, GA 31042

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Replacement of the Streets and Drainage Improvements
Post-Bid
Jesup, GA 31545

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

36” CMP Rehabilitation
Post-Bid
GA

Cherry-Church-Blanchard-King Avenues Drainage Improvements
Results
Pine Mountain, GA

T32-D6-Drainage Rehab-Pickens-97322
Post-Bid
GA

Sequoia Circle Drainage Improvements Phase II
Results
Hinesville, GA 31310

Drainage Base and Pave Construction
Post-Bid
Lyons, GA 30436

Pooler Old Town Drainage - Project B
Results
Less than $811,700 est. value
Pooler, GA 31322

T32-D6-Drain Rehab-Chattooga-97769
Post-Bid
GA

Reported 12/13/2019 12:00 AM
Project Title

Construction of Contract A - 2019 King Arthur Force Main and Sewer Improvements

Physical Address View project details and contacts
City, State (County) La Grange, GA 30240   (Troup County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Contract A - 2019 King Arthur Force Main & Sewer Improvements includes the following for: 1) The King Arthur 10" Sewer - 1130 LF of 10" DI, CL350 Sewer; 6 EA 48" Manholes; 6 EA Watertight Manhole Frame & Covers; 1 EA Connection to Existing Manhole; 1 LS Reconnect of all Sewer Service Connections; & 1130 LF of Pavement Replacement over the 10" Sewer; 2) The King Arthur 12" Force Main - 1650 LF of 12" DI, CL 350 Force Main; 80 LF of 12" DI RJ CL350 Force Main with Casing Spacers & End Seals installed in the existing 24" Casing; 1 EA 2" Combination Air Valve Assembly, Complete & 1320 LF of Pavement Replacement over the 12" Force Main; 3) The King Arthur 8" Sewer - 82 LF of 8" DI, CL350 Sewer; 2 EA 48" Manholes; 2 EA Watertight Manhole Frame & Covers; 1 EA Connection to Existing Manhole; Bore 80 LF of 16" Casing with 8" DI RJ, CL350 Sewer, Casing Spacers & End Seals, Complete; 4) The General Project Items - Mobilization; Demobilization; Erosion Control Work; Curb & Gutter Replacement; along with all required clearing, excavation, backfill, grading, testing and all other appurtenances and accessories.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents