Similar Projects
CHRL Pump Station 1a, 2, & 3
New Construction
Conception
$750,000 est. value
WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Stormwater Repairs Phase III Construction
Alteration
Design
$5,200,000 est. value
WA

Main Industrial Pump Station Rehabilitation
Renovation
Bidding
$400,000 est. value
Vancouver, WA

9th Street North East and Valley Mall Parkway Intersection Improvements
Infrastructure
Bidding
$1,000,000 est. value
East Wenatchee, WA 98802

Sewer Outfall Replacement
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Friday Harbor, WA 98250

Friday Harbor Labs Sewer Repair
Renovation, Alteration
Post-Bid
$160,000 to $200,000 est. value
Friday Harbor, WA 98250

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Solid Waste Facilities Pumps Systems Upgrades and Improvements
Renovation
Bidding
$2,000,000 est. value
Lacey, WA 98516

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Lynnwood Municipal Golf Course Irrigation Pump Station Fabrication
New Construction
Bidding
$190,000 est. value
Lynnwood, WA 98036

Environmental Consulting Services for 2021 Stormwater Code Amendments
Renovation, Alteration
Post-Bid
$75,000 est. value
Sammamish, WA 98075

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Last Updated 06/27/2022 06:13 AM
Project Title

Lift Station and Gravity Sewer Improvements

Physical Address View project details and contacts
City, State (County) Omak, WA   (Okanogan County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and new construction of a civil project in Omak, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a water / sewer project; and water / sewer project. Project Category Code: Sanitary Sewer (Gravity), Generator, Electrical and Controls, Lift Stations/Lift Station Equipment, Construction, Concrete Pavement, Electrical Installation/Construction, Sewer and Water Construction, Sitework/Excavating and Grading, Fencing/Guardrails/Handrails, Grade and Surface, Grubbing & Clearing, Buildings Commercial and Private Description: Lift station: Construction of a new below-ground lift station structure with new submersible wastewater pumps, valve and meter vault, gravity sewer piping and one (1) 48-inch dia. manhole. Work also includes new access driveway, fencing, site resurfacing and road restoration. Electrical construction consists of installing a new 40Kw diesel generator with subbase fuel tank and associated equipment controls housed beneath a new structural roof canopy. Work to include temporary sewer bypass pumping, dewatering, and traffic control as required. Gravity Sewer Improvements: Install approximately 400 LF of 6-inch PVC gravity sewer pipe by open-cut trench construction along with three (3) 48-inch dia. manholes and one (1) 84-inch dia. manhole. Work also consists of demolition and removal of two (2) existing 8,000-gallon septic tanks. Work to include temporary sewer bypass pumping, dewatering, and traffic control as required.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents