Similar Projects
Replacement Parking Lot at the Madison County Detention Home
Infrastructure
Bidding
$275,000 est. value
Edwardsville, IL 62025

PCC Driveway, PC Concrete Sidewalk
Infrastructure
Bidding
$2,000,000 est. value
Granite City, IL

Broadway and Zschokke Street Parking Lot
Infrastructure
Post-Bid
Highland, IL

Madison County Government Annex Probation Building Renovation
Renovation, Infrastructure, Alteration
Post-Bid
$2,000,000 to $3,000,000 est. value
Edwardsville, IL 62025

Health / Life Safety Renovations 2021 Parking Lot and Sanitary Improvements
Results
Less than $2,139,624 est. value
Highland, IL 62249

Concrete Repairs
Results
Alton, IL

Downtown TIF Sidewalk Improvements
Infrastructure
Post-Bid
Granite City, IL

Resurfacing and ADA Improvements on IL 111/3 from Alby Street to Broadway in Alton
Results
Alton, IL 62002

Columbus Elementary School Parking Lot
Infrastructure
Post-Bid
$275,000 est. value
Edwardsville, IL 62025

Health/Life Safety Renovations Parking Lot Improvements -West ES
Infrastructure
Results
Alton, IL 62002

2021 MCCD (Madison County Community Development) Street Improvements
Infrastructure
Post-Bid
$500,000 est. value
Madison, IL 62060

2021 CIP Sidewalk Contract
Infrastructure
Results
Edwardsville, IL

Tri-Township Park District Trails
Infrastructure
Post-Bid
$200,000 est. value
Troy, IL 62294

City Hall Parking Lot Improvements
Infrastructure
Results
Granite City, IL 62040

Pavement Reconstruction, New Sidewalks and Drainage Improvements on North Prairie Street from Corbin Street to Dorothy Street in Bethalto
Infrastructure
Results
Bethalto, IL

Last Updated 05/23/2022 01:50 AM
Project Title

Parking Lot Replacement Lincolnwood High School

Physical Address View project details and contacts
City, State (County) Bethalto, IL 62010   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes removal of existing drive surface and replaced with new at Lincolnwood High School.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents