Similar Projects
11Th Street Apartments
New Construction
Design
Mebane, NC

Seventh Avenue Streetscape
Infrastructure
Bidding
$2,000,000 est. value
Mountain Home, NC 28791

Turner Terrace Concrete Walk Installation/Repair
Infrastructure
Bidding
Lumberton, NC

Chapel Hill Transit-Parking Lot Expansion
Post-Bid
$200,000 to $350,000 est. value
Chapel Hill, NC 7516

Carolina Pines Parking Lot Repair
Post-Bid
Less than $200,000 est. value
Raleigh, NC 27601

Beaverdam Creek Greenway, Phase I
Results
Less than $1,370,628 est. value
Zebulon, NC

Blue Ridge Parkway Pavement Preservation - Asheville
Results
$1,000,000 to $5,000,000 est. value
Asheville, NC

2022 Crack Seal Chatham
Infrastructure
Bidding
NC

Haw River Greenway - Ruby Lane Extension
Post-Bid
Burlington, NC 27216

Pilot Mountain Overlook Improvements
Results
Pilot Mountain, NC 27041

Tourist and Event Center Rehabilitate Surface of Parking Lot
Infrastructure
Bidding
Havelock, NC 28532

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Extension of SR-1631 (Crossroads Parkway) to SR-1549 (Calvin Edney Road)
Results
Mars Hill, NC 28754

Resurfacing, Milling, Widening and Pvt. Mkgs
Infrastructure
Bidding
NC

Kerners Mill Creek Greenway
Post-Bid
Less than $1,742,000 est. value
Kernersville, NC

Last Updated 09/22/2021 12:01 PM
Project Title

West Third Street Project

Physical Address View project details and contacts
City, State (County) Kill Devil Hills, NC 27948   (Dare County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,100,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the overlay and reconstruction of pavement, removal and replacement of existing curb & gutter and sidewalk and installation of new sidewalk. Concrete work will also include partial removal and construction of new driveway segments as necessary, and construction or replacement of curb & gutter at specified intersections Storm drainage improvements will be installed, including HDPE pipe and "sock drain", associated drainage structures, and grass swales within the entire project area. An existing 8" asbestos-cement water main will be replaced with 8” and 6” PVC and ductile iron pipe, including fittings, valves, fire hydrant assemblies, tie-ins of side street mains and transfer of all water services from the old main to the new. All areas shall include incidental clearing, pavement cuts/patch, reseeding and restoration, etc. As a general indication to prospective bidders of the size of the project, the following approximate total lengths of pavement overlay/reconstruction is 3,525 linear feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents