Similar Projects
Reported | 10/04/2021 04:20 PM |
Project Title | Camelback Bridge Repair and Painting |
Physical Address | View project details and contacts |
City, State (County) | Normal, IL (McLean County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | All Bids Rejected |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is located on Virginia Avenue, beginning approximately 130 feet East of the intersection with Hillcrest Street, and extending 120 feet eastward, including Camelback Bridge (existing Structure No. 057-7821) which carries Virginia Ave over Constitution Trail. The project consists of removing and replacing all cross-bracing rods and turnbuckles at piers, retrofitting the top of all pier columns to shed water, removing and replacing concrete encasement at Piers No. 3 and 4 to extend the top of concrete above grade, replacing the missing expansion joint filler in retaining walls, cleaning and painting existing painted structural streel, metal railing, and new structural steel, and all necessary incidental work as shown on the plans or as described herein. |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |