Similar Projects
Golf Course Pavilion - City of Hutchinson
Infrastructure
Conception
$350,000 CJ est. value
Hutchinson, KS 67501

Bridge Replacement 6th Ave over ESD - City of Hutchinson
Demolition, New Construction, Infrastructure
Conception
$850,000 CJ est. value
Hutchinson, KS 67501

Rebuild Reconfigure 2nd / Walnut Parking Lot - City of Hutchinson
Infrastructure
Design
$300,000 CJ est. value
Hutchinson, KS 67501

Rebuild Reconfigure 2nd / Walnut Parking Lot - City of Hutchinson
Infrastructure
Design
$300,000 CJ est. value
Hutchinson, KS 67501

N Pleasant St and Hoagland St Bridge Replacement over the ESD
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Hutchinson, KS 67501

N Pleasant St and Hoagland St Bridge Replacement over the ESD
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Hutchinson, KS 67501

Construction of Orchard Park Event Center at Orchard Park
New Construction, Infrastructure - 4,200 SF
Post-Bid
$1,317,309 CJ est. value
Hutchinson, KS 67502

Kisiwa Village Sanitary Sewermain Repair
Infrastructure
Post-Bid
$50,000 CJ est. value
Hutchinson, KS 67501

Chip Seal - K148 Fr K148/K28 JCT E TO K148/US81 JCT in RP and JW Co. Lgth 22.50 MI.
Infrastructure
Results

Residential Street Maintenance
Infrastructure, Alteration
Results
$1,853,644 est. value
Hutchinson, KS

Woodie Seat Improvements Corridor Study
Infrastructure
Pending Verification
$2,500,000 CJ est. value
Hutchinson, KS 67501

Woodie Seat Improvements Corridor Study
Infrastructure
Pending Verification
$2,500,000 CJ est. value
Hutchinson, KS 67501

Halstead Street Reconstruct (Avenue G to 4th Road) - City of Hutchinson
Infrastructure
Conception
$4,700,000 CJ est. value
Hutchinson, KS 67502

Lift Station Improvements - City of Hutchinson
Infrastructure
Design
$2,750,000 CJ est. value
Hutchinson, KS 67501

Kansas State Fair House Of Capper Reconstruction BLDG NO.: 37300-00044
Demolition, New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Hutchinson, KS 67501

Last Updated 02/09/2023 03:25 PM
Project Title

CCLIP Resurfacing K61 from US50 to 17th Avenue

Physical Address View project details and contacts
City, State (County) Hutchinson, KS 67501   (Reno County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,211,209 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work provides for the furnishing of all materials, equipment and labor for constructing the CCLIP Resurfacing K61 from US50 to 17th Avenue, Project No. 20-19 in the City of Hutchinson, Kansas, and consists of the following estimated quantities for sample units of work: 2" Asphalt Milling - 38113 SY SR12.5A HMA Overlay (20%RAP)(PG70-22) - 4584 TONS Emulsified Asphalt (CRS-1HP) - 2220 GAL Cover Material (CML-2)(SEAL) - 69.76 CY 8" Full Depth Concrete Base Repair - 2397 SF Other Work includes Unclassified Excavation, Aggregate Base (AB-3)(6"), Pavement Marking, Traffic Control, and Mobilization. Direct all questions to Jeff Schenk at jeffs@hutchgov.com

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents