Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$750,000 est. value
WA

Terry Cargil Reservoir
Infrastructure
Bidding
$9,900,000 to $12,050,000 est. value
Lacey, WA

Well Rehabilitation and Water System Improvements Project - 2022
Infrastructure
Bidding
$350,000 to $400,000 est. value
Kahlotus, WA

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Oil Water Separators Maintenance Contract
Infrastructure
Post-Bid
Tacoma, WA 98433

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Downtown Stormwater Treatment Project
New Construction, Infrastructure
Bidding
$10,400,000 est. value
Marysville, WA

Condensate Pump 1 Alpha Refurbishment
Alteration
Post-Bid
Richland, WA

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Aurora 1160 Series Pump Refurbishment
Alteration
Post-Bid
Keyport, WA 98345

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Kayak Well Rehabilitation
Infrastructure
Post-Bid
$90,000 est. value
Stanwood, WA 98292

Illinois Well Facility
Infrastructure
Results
$3,025,682 to $3,276,814 est. value
Ellensburg, WA

Above Ground Storage Tank Internal Inspection
Term Contract
Post-Bid
Yakima, WA 98901

Reported 01/07/2022 12:00 AM
Project Title

Hanford Integrated Tank Disposition Contract

Physical Address View project details and contacts
City, State (County) WA   (Benton County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Hanford Integrated Tank Disposition Contract (ITDC) - both Tank Closure as well as Waste Treatment Plant (WTP) operations at the Hanford Site.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Subsurface Investigation, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents