Similar Projects
Lenexa Justice Center Renovation
Renovation
Design
$73,000,000 est. value
Lenexa, KS 66219

Material Testing Services for Switzer Road, 159th Street to 167th Street
Infrastructure
Bidding
Overland Park, KS 66225

RFP Engineering - 2022 Playground Replacement Projects
Infrastructure
Bidding
$350,000 est. value
Overland Park, KS 66223

Engineering, Planning and Development
Post-Bid

Engineering Services for Wastewater Treatment and Pumping Asset Renewal
Post-Bid
KS

Glendell Acres Park
Results
Edgerton, KS 66021

Architectural Design Services Indian Trails for Aquatics Center Improvements
Infrastructure
Results
Lenexa, KS

New Comprehensive Plan
New Construction
Post-Bid
Lenexa, KS

Gas Turbine Control System Upgrade
New Construction
Results
Gardner, KS

Nelson Wastewater Treatment Facility Improvements
Infrastructure
Post-Bid
Mission, KS

Architectural and Engineering Services for New Parks and Recreation Maintenance Facility
New Construction, Infrastructure
Results
Shawnee, KS

167th Center to Moonlight Public Street Improvement
Infrastructure
Post-Bid
Gardner, KS

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

El2204 Substation No. 4 and Transmission Line
Alteration
Post-Bid
Gardner, KS

Stormwater Engineering Services
Term Contract
Results
KS

Reported 06/21/2022 12:00 AM
Project Title

Engineering - 167th Street, Four Corners Road to Moonlight Road Project

Physical Address View project details and contacts
City, State (County) Gardner, KS 66031   (Johnson County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Providing engineering design services as described below. Perform a preliminary engineering study to establish the horizontal and vertical roadway alignment throughout the 3.5 mile corridor. Perform final design of the one-mile section of roadway from Center Street to Moonlight Road. Improvements will include: widening to a 3-lane typical section, storm drainage (enclosed or open ditch), Center Street intersection, Moonlight Road intersection, multiuse path, on-street bike lanes, sidewalk, and lighting. Phase 1 (Preliminary Design - Four Corners to Moonlight) 1. Data Collection 2. Prepare Preliminary Plans. 3. Prepare Right-of-way plans and associated documents. 4. Utility coordination. 5. Prepare updated cost estimates. 6. Assist with public information/outreach. 7. Coordinate with City of Gardner Utility Department regarding their sanitary sewer replacement project. 8. Assist in identifying potential funding sources and applications. Phase 2 (Final Design - Center to Moonlight) 1. Final design and plan production. 2. Obtain permits. 3. Utility coordination. 4. Prepare final cost estimate. 5. Assist with public information/outreach. 6. Prepare bid documents. Phase 3 (Construction - Center to Moonlight) 1. Review shop drawings. 2. Review material submittals. 3. Respond to contractor questions. 4. Provide as-built plans.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents