Similar Projects
Misc. Concrete Repair
Bidding
$159,240 est. value
FL

Hilochee Structure Replacement – Phase 1
Term Contract
Results
Less than $230,000 est. value
Lake Alfred, FL 33850

Miscellaneous Construction
Results
Less than $302,422 est. value
FL

Panther Point Trail
Results
Less than $510,000 est. value
Bartow, FL 33831

Concrete Sidewalks, Driveways and Curbs
Results
Bartow, FL 33831

Sheriff`s Office Garage North Parking Lot - Re-Surfacing
Results
Less than $50,000 est. value
Lakeland, FL 33803

ADA Mat Replacement
Results
Less than $80,000 est. value
FL

Three Parks Trail East New Jersey Road from Turtle Rock Drive to Glendale Street
Results
Lakeland, FL 33803

Polk County BOCC Administration Building Red Parking Lot Resurfacing and Restriping
Results
Less than $205,000 est. value
Bartow, FL 33830

Winter Haven Supervisor of Elections Parking Lot Resurface, Restriping
Results
Less than $60,000 est. value
Winter Haven, FL 33880

Bike Path/Trail/Lighting/Drainage Improvements
Results
Less than $832,392 est. value
Polk City, FL 33868

Ariana Street Sidewalk
Results
Less than $656,854 est. value
Lakeland, FL 33803

Polk County East Government Complex Parking Lots
Results
Less than $85,000 est. value
Bartow, FL 33830

4th Street NW Streetscape and Piazza
Results
$782,000 to $800,000 est. value
Winter Haven, FL 33881

Sidewalk Improvements
Results
Auburndale, FL 33823

Last Updated 03/23/2021 10:33 AM
Project Title

Sidewalk Extension

Physical Address View project details and contacts
City, State (County) Lake Alfred, FL 33850   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $65,474
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Prepare ground, form and pour new sidewalk. Approximately 3000 ft long. Prepare ground, form and pour a new sidewalk between the intersection of N Lake Shore Way & E Swoope St and the intersection of E Tangerine Ave & Lake Swoope Dr. The sidewalk will be approximately 3,000 feet long, 5 feet wide and 4 inches thick using 3000psi concrete. Excess dirt/soil removed during the construction process of the new sidewalk can be dumped at an offsite location, just a few minutes away from the job site. Edges of sidewalk will be backfilled, but sod will not be required to be replaced along the edges of the new sidewalk. Project will be in City right-of-way and must adhere to ADA standards.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents