Similar Projects
Pleasant Park
Sub-Bidding
Less than $36,000,000 est. value
Apex, NC 27502

North Waterfront Park Project
Post-Bid
Wilmington, NC

Intersection Improvements: Grading, Paving, Drainage, Culvert, and Lighting Intersection
Post-Bid
NC

Construction and Expansion of the Lake Rogers Park
Results
Less than $600,000 est. value
Creedmoor, NC 27522

Buckeye Recreation Center Site Improvements
Results
Less than $93,480 est. value
Beech Mountain, NC

Hoke Loop Commons
New Construction - 88,610 SF
Construction
Fayetteville, NC

Zebulon Green
New Construction - 88,610 SF
Construction
Zebulon, NC

Hoover Road Athletic Park
Post-Bid
Less than $8,500,000 est. value
Durham, NC

Dorothea Drive Drainage Improvements (Formal)
Results
Raleigh, NC

Cambridge Park
New Construction
Construction
Mebane, NC

East River Phase 1 Project
Post-Bid
Clayton, NC 27527

Cape Fear River Trail Phase II - Part C
Results
Less than $2,424,242 est. value
Fayetteville, NC

Town of Ocean Isle Beach Town Park
Construction
Less than $1,867,550 est. value
Ocean Isle Beach, NC 28469

Outdoor Playing Fields at the Surf City Elementary and Middle School Campus
Post-Bid
Hampstead, NC 28443

Dillard Middle/Mina Weil Track Repaving
Results
Goldsboro, NC

Last Updated 03/16/2021 10:01 AM
Project Title

Orange High School Athletic Improvements and Pathways Elementary Drainage

Physical Address View project details and contacts
City, State (County) Hillsborough, NC 27278   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of improvements for the Orange HS- Athletic Improvement project includes removing and replacing of existing track and the repair of cracks on the existing tennis courts including all work normal, necessary and usual in the construction of such improvements. Work will generally include, site preparation including minor demolition, grading, storm and erosion and sediment control, concrete paving, seeding and lawn restoration, and paint striping. Construction of improvements for the Pathways Elementary School project includes site preparation including minor demolition, grading, storm and erosion and sediment control, concrete paving, seeding and lawn restoration.

Details

Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents