Similar Projects
Circle K - Lawrenceville Hwy / Lawrenceville
New Construction, Infrastructure - 6,000 SF
Design
$1,400,000 CJ est. value
Lawrenceville, GA 30044

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

Oconee River Greenway And Riverwalk At Fishing Creek, Phase 3
Renovation
Post-Bid
Milledgeville, GA 31061

Westwood Avenue Pedestrian Path
Renovation
Post-Bid
Morrow, GA

Lake Spivey Multi-Use Trail Construction, Phase IV
Results
Jonesboro, GA 30236

Frazier Rowe Park - Site Preparation, Pavilion Assembly and Installation
Term Contract
Results
North Decatur, GA 30033

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Winder Retail Center - Site
New Construction
Construction
Winder, GA

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Pending Verification
$48,000,000 CJ est. value
Powder Springs, GA 30127

The Reserve at Wynn
New Construction
Pending Verification
Warner Robins, GA

Rowen Phase 1 Roads and Infrastructure
Infrastructure
Design
$18,000,000 est. value
Dacula, GA

Level Grove Multiuse Path Phase 2
Renovation
Post-Bid
Cornelia, GA 30531

Construction of a Dog Park on County Way
Results
Cumming, GA 30040

Harbour Point Entrance
New Construction, Demolition
Construction
Gainesville, GA

Blastec - Site Only
Renovation
Design
Cumming, GA 30041

Last Updated 08/30/2022 04:35 PM
Project Title

Riley Track Resurfacing Project

Physical Address View project details and contacts
City, State (County) Peachtree City, GA 30269   (Fayette County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall furnish all materials, labor, tools, and equipment necessary for the removal/disposal of existing track rubber surface and asphalt and for the installation of new asphalt and synthetic track surface on the oval as well as high jump and long jump event areas and line markings on all areas detailed in the contract photographs. Track must be relined as it is now. All work to conform to plans and specifications outlined in bid package. Complete bid package and any addenda can be found on the City's website at electronically.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents