Similar Projects
Mill and Overlay - TH 12
Infrastructure
Conception
$5,300,000 CJ est. value
Darwin, MN 55324

Mill and Overlay - TH 12
Infrastructure
Conception
$5,300,000 CJ est. value
Darwin, MN 55324

Wellness/Recreation Center - City of Litchfield
New Construction, Infrastructure
Design
$13,545,000 CJ est. value
Litchfield, MN 55355

Class 1 Modify Gravel
Term Contract
Design
Dassel, MN 55325

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Design Replace Building 22 Pipe RTC-Brainerd
Renovation, Infrastructure, Alteration
Results
Brainerd, MN

2022 First Street (CSAH 4) Improvements
Infrastructure
Results
$270,000 est. value
Dassel, MN

692nd Avenue & 250th Street Otta Seal
Infrastructure
Post-Bid
$120,000 CJ est. value
Dassel, MN 55325

Grading, Stabilized Full Depth Reclamation, Bituminous Surfacing, and Revise Signal and Conflict Warning System and Chip Seal
Infrastructure
Results
$11,584,994 CJ est. value
Litchfield, MN 55355

Crack Sealing
Infrastructure
Post-Bid
$14,180 CJ est. value
Kingston, MN 55325

2022 Street Improvements
Infrastructure
Results
$416,823 CJ est. value
Grove City, MN 56243

2023 Pavement Improvement Project
Infrastructure
Post-Bid
$306,725 CJ est. value
Dassel, MN 55325

Safe Routes to School Project
Infrastructure
Results
$491,068 CJ est. value
Dassel, MN 55325

Mn-Litchfield Wetland Management District-HQ Cement Walkway Replacement
Infrastructure
Post-Bid
$25,000 CJ est. value
Litchfield, MN 55355

Last Updated 02/14/2024 11:59 AM
Project Title

Commercial Street and Holcombe Drainage Improvements

Physical Address View project details and contacts
City, State (County) Litchfield, MN 55355   (Meeker County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $789,168 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 13, 2023, the project has not been awarded. A timeline for award has not been confirmed. The work includes the construction of approximately: 738 CY AGGREGATE BASE, CL 5 138 LF 42" STEEL CASING - TRENCHLESS CONSTRUCTION 436 TON BITUMINOUS SURFACING 79 LF CONSTRUCT DRAINAGE STRUCTURE 700 SY 8" CONCRETE PAVEMENT 916 LF CONCRETE CURB & GUTTER 941 LF 12" - 30" STORM SEWER PIPE together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Responsible Contractor Certification. Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents. 7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing to the Issuing Office. Contact information and submittal procedures for such questions are as follows: 2040 Hwy. 12 East, Willmar, MN, 56201-5818, (320) 231-3956, fax (320) 231-9710

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents