Similar Projects
RFQ Design - CDBG Possum Hollow Park Lighting
Infrastructure
Conception
$400,000 CJ est. value
Slidell, LA 70458

Menetre Boat Launch - City of Covington
Infrastructure
Conception
$850,000 CJ est. value
Covington, LA 70433

LA 3292: LA 40-wash P/L (Isabel Swamp Rd)
Infrastructure
Design
$2,500,000 CJ est. value
Lacombe, LA 70445

LA 3292: LA 40-wash P/L (Isabel Swamp Rd)
Infrastructure
Design
$2,500,000 CJ est. value
Lacombe, LA 70445

2023 District Panel Replacements
Infrastructure
Bidding
$440,000 CJ est. value
Mandeville, LA 70470

2023 District Panel Replacements
Infrastructure
Bidding
$440,000 CJ est. value
Mandeville, LA 70470

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Reiher Road Drainage
Infrastructure
Post-Bid
$120,000 CJ est. value
Mandeville, LA 70471

Civil Site Work for Three Artificial Turf Fields, STPSB Project
Infrastructure
Results
LA

US 190 Pump Station Force Main Upgrade
Infrastructure
Results
$1,230,201 CJ est. value
Covington, LA 70433

Slidell Memorial Hospital SMH Three Story Building Addition
Addition, Demolition, Infrastructure
Construction
$36,000,000 CJ est. value
Slidell, LA 70458

Station 19 Fire Station
New Construction, Infrastructure
Construction
$1,493,300 CJ est. value
Slidell, LA 70461

Medline Distribution Center
New Construction, Infrastructure - 800,000 SF
Pending Verification
$53,000,000 CJ est. value
Covington, LA 70433

Bonterra Subdivision, Phases 2 and 3
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Pearl River, LA 70452

Columbia Street Bridge Replacement - City of Covington
Infrastructure
Conception
$1,500,000 CJ est. value
Covington, LA 70433

Last Updated 04/20/2023 01:04 AM
Project Title

US 90 : West Pearl Br Wire Rope Replacement

Physical Address View project details and contacts
City, State (County) Lacombe, LA 70445   (Saint Tammany County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Type Improvement :Wire Rope Replacement Length 0.10 miles) Parish : St. Tammany Estimated Cost Range $250,000 to $500,000 As of April 20, 2023 , the project is in Design status. Anticipated letting date is August 09, 2023. LADOT - US 90 : West Pearl Br Wire Rope Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents