Similar Projects
3 Triad Center Ceiling Tile Replacement
Renovation
Post-Bid
Salt Lake City, UT 84103

Park Lane Elementary Gym Divider Replacement
Infrastructure
Post-Bid
Sandy, UT 84092

Construction Manager/General Contractor Services for Leisure Pool Roof Decking, Interior Panels and Pool Air Handlers
Results
Less than $1,600,000 est. value
Bountiful, UT 84010

Abatement of Asbestos; Window Putty, Vinyl Tile, Paper Material, White Duct Tape, Sheet Vinyl
Results
Castle Dale, UT

Replacement and Installation of Cabinets and Countertops at Sally Mauro Elementary
Renovation
Post-Bid
Helper, UT 84526

Secure Entry - Herriman High School
Results
Herriman, UT 84096

Replacement and Installation of Cabinets and Countertops in 4 Classrooms at Two Schools
Renovation
Post-Bid
Price, UT

Secure Entry - Copper Hills High School
Results
West Jordan, UT 84081

Southwest Technical College Student Services Remodel
Renovation, Term Contract
Post-Bid
Cedar City, UT 84720

LC 309 311 Remodel
Results
$140,000 est. value
Orem, UT 84058

Replacement of Epoxy Seamless Shower Floor and Walls Project
Alteration
Post-Bid
Vernal, UT 84078

U Hospital Mediserve Renovo Dock Remodel - Metal Stud Framing
Results
Less than $64,238 est. value
Salt Lake City, UT 84113

9905--VA Signage Removal and Installation
Term Contract
Post-Bid
Salt Lake City, UT 84148

SLCC Linoleum Marmoleum Wainscotting
Results
Salt Lake City, UT

4800 South Pole Barn Insulation Project
Alteration
Post-Bid
Roy, UT 84067

Last Updated 06/20/2022 02:30 AM
Project Title

Lone Peak High Classroom Ceiling Remodel

Physical Address View project details and contacts
City, State (County) Highland, UT 84003   (Utah County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this RFP is to enter into a contract to provide: Classroom ceiling remodel at Lone Peak High School. The contract resulting from this RFP will be for the duration of this project. The projected construction start date is ASAP and the completion date must be by August 1st, 2022.Lone Peak High School TV Production classroom is in need of remodeling the ceiling and all mechanical and electrical equipment along with the existing walls needing to be extended to the roof deck with new lighting and mechanical equipment installed. The District reserves the right to conduct discussions with the Offerors who submit proposals determined to be reasonably susceptible of being selected for award, followed by an opportunity to make best and final offers pursuant to UCA 63G-6a-707.5, but proposals may be accepted without discussions. Question Submission Close Date 5/20/2022 2:00 PM MDT

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents