Similar Projects
Manor Commons SE Commercial Lot – Shared Driveway with DQ Grill & Chill
Design
Manor, TX 78653

Pfluger Hall Sidewalk & Drainage Improvements
Post-Bid
Pflugerville, TX 78660

Asphalt Parking Lots and Walking Trail Overlay Project
Post-Bid
Lakeway, TX 78734

Local Mobility ADA Sidewalk and Ramp IMPS Grp22A Citywide - IDIQ
Term Contract
Results
Less than $1,000,000 est. value
Austin, TX 73301

Vernagene Mott Elementary Parking Expansion
Results
Less than $800,000 est. value
Pflugerville, TX 78660

HEB Austin 15 - Curbside #183
Addition - 1,925 SF
Construction
$250,000 est. value
Austin, TX 78753

The Norwood House Parking Lot – Phase I
Renovation
Post-Bid
Austin, TX 78704

Village of the Hills Walking Trail Phase 2
Results
Less than $687,000 est. value
The Hills, TX 78738

ADA Ramp and Bus Stop Improvements 2020 Citywide IDIQ(CIP)
Term Contract
Results
$1,000,000 est. value
Austin, TX 78704

Local Mobility ADA Sidewalk and Ramp IMPS Grp 23A City Wide - IDIQ
Term Contract
Results
$6,000,000 est. value
Austin, TX 73301

Local Mobility ADA Sidewalk and Ramp IMPS Grp 25 City wide - IDIQ
Term Contract
Results
$7,000,000 est. value
Austin, TX 73301

ADA Sidewalk Rehabilitation - Group 1 IDIQ
Term Contract
Results
$1,000,000 est. value
Austin, TX 78704

ADA Sidewalk Rehabilitation - Group 2 IDIQ(Cip)
Term Contract
Results
$12,000,000 est. value
Austin, TX 73301

Corridor Mobility Program Bicycle & Pedestrian Improvements
Term Contract
Results
$10,000,000 est. value
Austin, TX 78704

Construct ADA Curb Ramps, Sidewalk and Ped Signals
Results
Less than $2,680,697 est. value
TX

Last Updated 03/05/2020 07:40 AM
Project Title

Urban Trails Plan and Sidewalk/ADA Transition Plan Updates

Physical Address View project details and contacts
City, State (County) Austin, TX 78704   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Update the Urban Trails Plan: The purpose of this update is to update internal policies and to re-examine the proposed trail network. Through the update process, potential new trail alignments or connections should be identified, and existing trail alignments should be re-evaluated based on equity, feasibility, changes in floodplain regulations, network demand, micromobility, and other relevant criteria. Additionally, new strategies to sustainably maintain the trail network and engage users should be addressed. Update the Sidewalks/ADA Transition Plan: The purpose of this update is to: 1) develop a comprehensive sidewalk network buildout plan that supports a complete transit/pedestrian transportation network; 2) provide a transparent web based interactive map of the data and criteria used in the selection of sidewalk improvement projects; 3) undertake a policy and business process review and provide recommendations to support an integrated asset management approach to sidewalk/pedestrian infrastructure.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents