Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Measure T - New Fire Station 36 - City of San Jose
New Construction, Infrastructure
Conception
$11,985,000 est. value
San Jose, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

CHP-Gilroy Commercial Vehicle Enforcement Facility (CVEF) Southbound (SB) – Parking Lot Steam Cleaning Services
Term Contract
Post-Bid
Gilroy, CA

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Main Street Milpitas
New Construction, Infrastructure - 350,257 SF
Design
$16,300,000 CJ est. value
Milpitas, CA 95035

CHP - Gilroy Commercial Vehicle Enforcement Facility (CVEF) Northbound (NB) - Parking Lot Steam Cleaning Services
Infrastructure
Post-Bid
San Martin, CA 95046

Lawrence Expressway Pavement Rehabilitation Project Between US-101 and SR-237
Infrastructure
Results
Santa Clara, CA 95056

Last Updated 09/19/2022 02:05 AM
Project Title

Annual Street Resurfacing Project and City Alley Resurfacing

Physical Address View project details and contacts
City, State (County) Los Altos Hills, CA 94022   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,711,831 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 26, 2022, project was awarded to O'Grady Paving Inc., awarded amount is $5,711,830.95** The Engineer’s Estimate for the above project is between $5,100,000 to $5,500,000. The City of Los Altos, Santa Clara County, California, invites sealed bids furnishing labor, material and equipment required to complete the project in the particular locations, of the forms, sizes and dimensions and of the materials and to the lines and grades and at the elevations as shown and delineated upon the plans and specifications made therefore. The project includes but is not limited to mobilization, deep lift asphalt concrete pavement repairs (cut & plug), milling and asphalt overlay on existing pavement, micro-surfacing, traffic control, striping and signage improvements, installation of concrete sidewalk, curb ramps, and curb & gutter, installation of loop detectors and all other items or details not mentioned above that are required by the contract Drawings and Specifications to repair various streets within the City of Los Altos. Location of Work: All of said work is to be done at the places indicated on exhibit list and map of street segments and locations, in accordance with these specifications. Contractor's License: The Contractor is required to have a Class A General Engineering or Class C-12 Earthwork and Paving Contractor for this work. All bidders shall be licensed under the provisions of Chapter 9, Division 3 of the Business and Professions Code of the State of California to do the type of work contemplated in the project. Bid Bond: Bids must be accompanied by a certified or cashier's check, or a Bid Bond in favor of the City in an amount not less than ten percent (10%) of the submitted Total Bid Price. Payment & Performance Bonds: The successful Bidder will be required to furnish the City with a Performance Bond and a Payment Bond, each equal to 100% of the successful Bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California. The cost of said bonds shall be included in the Bid amount. Award of Contract: Said bids will be presented to and considered by the City Council at a regularly scheduled meeting. The City shall award the Contract for the Project to the lowest responsive, responsible Bidder on the basis of the TOTAL BASE BID. Time of Completion of Work: The work shall be completed and ready for full use within 90 calendar days. All microsurfacing areas in the project must be completed first, and construction on School area must be prioritized for completion as well. 2'' Mill & Fill Streets: o Berry Avenue o St. Joseph Avenue Microsurfacing: o Portola Avenue o Santa Rita Avenue o St. Joseph Avenue o Jardin Drive Striping: o Almond Avenue o Oak Avenue o Covington Road Substitution of Securities: Pursuant to Public Contract Code section 22300, the successful Bidder may substitute certain securities for funds withheld by City to ensure his performance under the Contract. Rights of the City: The City reserves the right to cancel the project, and to reject any or all bids if not satisfied as to the price for the work or the responsibility of the bidder. The City also reserves the right to waive any informalities according to law. Project Administration: All questions relative to this project prior to the opening of bids shall be in writing and directed to the City Engineer, City of Los Altos, 1 North San Antonio Rd., Los Altos, CA, 94022. Send your questions to jsandoval@losaltosca.gov and cc mloatfi@losaltosca.gov . The deadline for questions is Seven (7) days before the bid opening date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents