Similar Projects
Septic Access Cover Project
Infrastructure
Design
Houlton, ME 04730

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Route 1 Water Main Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Madawaska, ME 04756

Paving
Infrastructure
Post-Bid
$200,000 CJ est. value
Limestone, ME 04750

Town of St. John Plantation Septic System Bid
Infrastructure
Post-Bid
$400,000 CJ est. value
St John Plt, ME 04743

Statewide Geotechnical Drilling
Infrastructure
Results

Nylander Museum Water Damage Repairs
Infrastructure
Results
Caribou, ME 04736

1-GW King Pine Wind Generation Project
Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Portage Lake, ME 04768

Cyclical Pavement Resurfacing in the Towns of Merrill and Smyrna and Plantation of Moro - Region 5
Infrastructure
Bidding
$4,000,000 CJ est. value
Merrill, ME 04780

Septic System
Infrastructure
Post-Bid
$20,000 CJ est. value
Frenchville, ME 04745

St. Agatha Road Paving
Infrastructure
Results
$184,240 CJ est. value
Saint Agatha, ME 04772

Hot Mix Overlay - Ashland, Masardis, T8 R5 WELS, & T9 R5 WELS - Region 5
Infrastructure
Bidding
$4,000,000 CJ est. value
Ashland, ME 04732

Transmission Main Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
Houlton, ME 04730

Sewer Placement
Infrastructure
Results
$44,165 CJ est. value
Sherman, ME 04776

Pavement Grooving and Polyurea Painting - Region 5
Infrastructure
Bidding
$1,147,000 CJ est. value
Crystal, ME 04747

Last Updated 03/22/2023 01:09 PM
Project Title

Route 11 Water Main Replacement

Physical Address View project details and contacts
City, State (County) Fort Kent, ME 04743   (Aroostook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Route 11 Water Main Replacement Project consists of installation of 5,500 feet Owner-furnished 8-inch water main and reconnection to existing services, and all materials, equipment, services, and construction inherent to the Work. The Work shall be substantially complete within 90 days from the commencement of Contract Time and completed and ready for final payment 120 days from the commencement of Contract Time. A pre-bid conference will not be held. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Woodard & Curran (Engineer) Kayla Marquis at kmarquis@woodardcurran.com with a copy to: Wyatt Matyas at wmatyas@woodardcurran.com

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents