Similar Projects
Last Updated | 03/14/2023 09:03 AM |
Project Title | HVAC Replacement at Denny Farrell Riverbank State Park |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10031 (New York County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,518,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 13, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 14% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 221 Calendar Days Business entities awarded an identical or substantially similar procurement contract within the past five years: N/A Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by Bid Security in the form of a certified check, bank check, or bid bond in the amount of: General Construction Contract D006055: $147,500 A general description of the primary work elements is listed below for reference. Contractor is responsible for reviewing all the drawings and specifications to obtain a complete understanding of the entire work scope. This contract includes all work indicated on the project documents, including but not limited to: 1. Mobilization and establishment of site access and maintenance and protection of existing conditions. 2. Demolish HV-11, CU-11A, CU-11B, and HV-14 and all HVAC piping and controls associated with these units. Contractor shall install and furnish AHU-11A, AHU-11B, ACCU-11A, ACCU-11B, and RTU-14. 3. Contractor shall install electrical and fire alarm connections for all new HVAC units. 4. Contractor shall install structural dunnage and support for all new HVAC units and ductwork. 5. Contractor shall patch all roof penetrations for duct support and equipment curbs. The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. Question Deadline 01/05/2023 at 1:00 PM ET *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The bid opening date has changed, it will be February 2, 2023 1:00 PM. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |